Home

Galveston District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

SpaceX proposed to modify the existing permit.

Full Public Notice Project Plans

PROJECT DESCRIPTION: SpaceX proposed to modify the existing permit for the continued development of the SpaceX vertical launch area with the expansion and addition of test, orbital, and landing pads, integration towers, associated infrastructure, stormwater management features and vehicle parking. The proposed expansion will impact 10.94 acres of mud flats, 5.94 acres of estuarine wetlands, and 0.28 acres of non-tidal wetlands.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas