You can copy from here when filling out the rest of the page.
On January 13, 2021, the U.S. Army Corps of Engineers (Corps) published a final rule in the Federal Register (86 FR 2744) announcing the reissuance of 12 existing nationwide permits (NWPs) and four new NWPs, as well as the reissuance of NWP general conditions and definitions with some modifications. The January 13, 2021, Federal Register notice is available for viewing at https://www.federalregister.gov/documents/2021/01/13/2021-00102/reissuance-and-modification-of-nationwide-permits. The 16 NWPs, listed below, become effective on March 15, 2021, and will expire on March 14, 2026:
PUBLIC NOTICE FOR FEDERAL REGISTER NOTICE
ANNOUNCING THE REISSUANCE OF THE NATIONWIDE PERMITS
On January 13, 2021, the U.S. Army Corps of Engineers (Corps) published a final rule in the Federal Register (86 FR 2744) announcing the reissuance of 12 existing nationwide permits (NWPs) and four new NWPs, as well as the reissuance of NWP general conditions and definitions with some modifications. The January 13, 2021, Federal Register notice is available for viewing at https://www.federalregister.gov/documents/2021/01/13/2021-00102/reissuance-and-modification-of-nationwide-permits. The 16 NWPs, listed below, become effective on March 15, 2021, and will expire on March 14, 2026:
NWP 12 – Oil or Natural Gas Pipeline Activities
NWP 21 – Surface Coal Mining Activities
NWP 29 – Residential Developments
NWP 39 – Commercial and Institutional Developments
NWP 40 – Agricultural Activities
NWP 42 – Recreational Facilities
NWP 43 – Stormwater Management Facilities
NWP 44 – Mining Activities
NWP 48 – Commercial Shellfish Mariculture Activities
NWP 50 – Underground Coal Mining Activities
NWP 51 – Land-Based Renewable Energy Generation Facilities
NWP 52 – Water-Based Renewable Energy Generation Pilot Projects
NWP 55 – Seaweed Mariculture Activities
NWP 56 – Finfish Mariculture Activities
NWP 57 – Electric Utility Line and Telecommunications Activities
NWP 58 – Utility Line Activities for Water and Other Substances
On February 15, 2021, the Great Lakes and Ohio River Division (LRD) approved Regional Conditions for the 2021 NWPs in Indiana. The Regional Conditions for the 2021 NWPs for Indiana become effective on March 15, 2021 and are attached to this public notice. Additionally, the Louisville District has posted the Indiana Regional Conditions for the 2021 NWPs on its internet home page at: http://www.lrl.usace.army.mil/Missions/Regulatory/Obtain-a-Permit/Nationwide/.
The Indiana Department of Environmental Management (IDEM) waived 401 Water Quality Certification (WQC) for NWPs 48, 55, and 56, therefore no 401 WQC will be required for a project authorized by NWPs 48, 55, and 56. IDEM denied the 401 WQC for NWP 43, therefore an individual 401 WQC will be required for a project authorized by NWP 43. IDEM included 25 general conditions that will apply to all of the 2021 NWPs. They also included specific conditions for NWPs 12, 29, 39, 40, 42, 44, 51, 52, 57, and 58. An individual 401 WQC will be required by IDEM under certain conditions. The 401 WQC for the 2021 NWPs becomes effective on March 15, 2021 and is attached to this public notice. Additionally, the Louisville District has posted the 401 WQC on its internet homepage at the link noted above.
There are 40 existing NWPs that were not reissued or modified by the January 13, 2021 final rule. Those 40 NWPs were published in the January 6, 2017 issue of the Federal Register (82 FR 1860). The 40 2017 NWPs, accompanying Regional Conditions and 401 WQC will remain in effect until the Corps issues a final rule reissuing those NWPs, Regional Conditions, and 401 WQC, or until March 18, 2022, whichever comes first. Listed below are the 40 2017 NWPs that remain in effect.
NWP 1 – Aids to Navigation
NWP 2 – Structures in Artificial Canals
NWP 3 – Maintenance
NWP 4 – Fish and Wildlife Harvesting, Enhancement, and Attraction Devices and Activities
NWP 5 – Scientific Measurement Devices
NWP 6 – Survey Activities
NWP 7 – Outfall Structures and Associated Intake Structures
NWP 8 – Oil and Gas Structures on the Outer Continental Shelf
NWP 9 – Structures in Fleeting and Anchorage Areas
NWP 10 – Mooring Buoys
NWP 11 – Temporary Recreational Structures
NWP 13 – Bank Stabilization
NWP 14 – Linear Transportation Projects
NWP 15 – U.S. Coast Guard Approved Bridges
NWP 16 – Return Water From Upland Contained Disposal Areas
NWP 17 – Hydropower Projects
NWP 18 – Minor Discharges
NWP 19 – Minor Dredging
NWP 20 – Response Operations for Oil or Hazardous Substances
NWP 22 – Removal of Vessels
NWP 23 – Approved Categorical Exclusions
NWP 24 – Indian Tribe or State Administered Section 404 Programs
NWP 25 – Structural Discharges
NWP 27 – Aquatic Habitat Restoration, Establishment, and Enhancement Activities
NWP 28 – Modifications of Existing Marinas
NWP 30 – Moist Soil Management for Wildlife
NWP 31 – Maintenance of Existing Flood Control Facilities
NWP 32 – Completed Enforcement Actions
NWP 33 – Temporary Construction, Access, and Dewatering
NWP 34 – Cranberry Production Activities
NWP 35 – Maintenance Dredging of Existing Basins
NWP 36 – Boat Ramps
NWP 37 – Emergency Watershed Protection and Rehabilitation
NWP 38 – Cleanup of Hazardous and Toxic Waste
NWP 41 – Reshaping Existing Drainage Ditches
NWP 45 – Repair of Uplands Damaged by Discrete Events
NWP 46 – Discharges in Ditches
NWP 49 – Coal Remining Activities
NWP 53 – Removal of Low-Head Dams
NWP 54 – Living Shorelines
Questions concerning implementation of the NWPs and associated Regional Conditions should be sent to LRL.RegulatoryPublicComment@usace.army.mil or you can contact Ms. Kimberly J. Simpson at (502) 315-6691.