On January 13, 2021, the U.S. Army Corps of Engineers (Corps) published a final rule in the Federal Register (86 FR 2744) announcing the reissuance of 12 existing nationwide permits (NWPs) and four new NWPs, as well as the reissuance of NWP general conditions and definitions with some modifications. These 16 NWPs will go into effect on March 15, 2021 and will expire on March 14, 2026.

FINAL PUBLIC NOTICE

PUBLIC NOTICE FOR THE FINAL REGIONAL CONDITIONS IN TEXAS WITHIN ALBUQUERQUE DISTRICT THAT ARE

APPLICABLE TO THE 16 NATIONWIDE PERMITS PUBLISHED IN THE FEDERAL

REGISTER ON JANUARY 13, 2021

On January 13, 2021, the U.S. Army Corps of Engineers (Corps) published a final rule in the Federal Register (86 FR 2744) announcing the reissuance of 12 existing nationwide permits (NWPs) and four new NWPs, as well as the reissuance of NWP general conditions and definitions with some modifications. These 16 NWPs will go into effect on March 15, 2021and will expire on March 14, 2026:

NWP 12 – Oil or Natural Gas Pipeline Activities

NWP 21 – Surface Coal Mining Activities

NWP 29 – Residential Developments

NWP 39 – Commercial and Institutional Developments

NWP 40 – Agricultural Activities

NWP 42 – Recreational Facilities

NWP 43 – Stormwater Management Facilities

NWP 44 – Mining Activities

NWP 48 – Commercial Shellfish Mariculture Activities

NWP 50 – Underground Coal Mining Activities

NWP 51 – Land-Based Renewable Energy Generation Facilities

NWP 52 – Water-Based Renewable Energy Generation Pilot Projects

NWP 55 – Seaweed Mariculture Activities

NWP 56 – Finfish Mariculture Activities

NWP 57 – Electric Utility Line and Telecommunications Activities

NWP 58 – Utility Line Activities for Water and Other Substances

The January 13, 2021, Federal Register notice is available for viewing at https://www.federalregister.gov/documents/2021/01/13/2021-00102/reissuance-and-modification-ofnationwide-permits.As an alternative, interested parties can access the January 13, 2021, final rule and related documents at: https://www.usace.army.mil/Missions/Civil-Works/Regulatory-Program-and-Permits/Nationwide-Permits/.

There are 40 existing NWPs that were not reissued or modified by the January 13, 2021 final rule. Those 40 NWPs were published in the January 6, 2017, issue of the Federal Register (82 FR 1860) and those NWPs remain in effect until the Corps issues a final rule reissuing those NWPs or March 18, 2022, whichever comes first. The 40 2017 NWPs that remain in effect are:

NWP 1 – Aids to Navigation NWP 2 – Structures in Artificial Canals NWP 3 – Maintenance NWP 4 – Fish and Wildlife Harvesting, Enhancement, and Attraction Devices and Activities NWP 5 – Scientific Measurement Devices NWP 6 – Survey Activities NWP 7 – Outfall Structures and Associated Intake Structures NWP 8 – Oil and Gas Structures on the Outer Continental Shelf NWP 9 – Structures in Fleeting and Anchorage Areas NWP 10 – Mooring Buoys

NWP 11 – Temporary Recreational Structures

NWP 13 – Bank Stabilization

NWP 14 – Linear Transportation Projects

NWP 15 – U.S. Coast Guard Approved Bridges

NWP 16 – Return Water From Upland Contained Disposal Areas

NWP 17 – Hydropower Projects

NWP 18 – Minor Discharges

NWP 19 – Minor Dredging

NWP 20 – Response Operations for Oil or Hazardous Substances

NWP 22 – Removal of Vessels

NWP 23 – Approved Categorical Exclusions

NWP 24 – Indian Tribe or State Administered Section 404 Programs

NWP 25 – Structural Discharges

NWP 27 – Aquatic Habitat Restoration, Establishment, and Enhancement Activities

NWP 28 – Modifications of Existing Marinas

NWP 30 – Moist Soil Management for Wildlife

NWP 31 – Maintenance of Existing Flood Control Facilities

NWP 32 – Completed Enforcement Actions

NWP 33 – Temporary Construction, Access, and Dewatering

NWP 34 – Cranberry Production Activities

NWP 35 – Maintenance Dredging of Existing Basins

NWP 36 – Boat Ramps

NWP 37 – Emergency Watershed Protection and Rehabilitation

NWP 38 – Cleanup of Hazardous and Toxic Waste

NWP 41 – Reshaping Existing Drainage Ditches

NWP 45 – Repair of Uplands Damaged by Discrete Events

NWP 46 – Discharges in Ditches

NWP 49 – Coal Remining Activities

NWP 53 – Removal of Low-Head Dams

NWP 54 – Living Shorelines

The regional conditions for these 40 NWPs that were approved by the Division Engineer in 2017 remain in effect and can be found at https://www.spa.usace.army.mil/Missions/Regulatory-Program-and-Permits/NWP/.

TEXAS CWA SECTION 401 WATER QUALITY CERTIFICATIONS

With the exception of NWP 55 and NWP 56 for which no water quality certification was requested, the Environmental Protection Agency (EPA) Region 6, by letter dated December 14, 2020, on behalf of Ysleta del Sur Pueblo, Alabama-Coushatta Tribe of Texas, and Kickapoo Traditional Tribe of Texas, granted CWA Section 401 certification, with no conditions, for these 16 NWPs (Encl 3). EPA Region 6 has determined that any discharge that could be authorized under these 14 NWPs would comply with water quality requirements, as defined at 40 CFR 121.1(n).

The Texas Commission on Environmental Quality (TCEQ), by letter dated December 18, 2020, conditionally certified these 16 NWPs, with the exception of NWP 48, NWP 55, and NWP 56 which were certified with no conditions (Encl 4). TCEQ has determined that any discharge that could be authorized under these 16 NWPs would comply with water quality requirements, as required by CWA Section 401 certification and pursuant to Title 30 Texas Administrative Code (TAC) Chapter 279. Conditions for each NWP were defined in the TCEQ’s water quality certification letter.

The Texas Railroad Commission (TxRRC), by letter dated December 18, 2020, conditionally certified NWP 12, NWP 43, and NWP 58 (fka D) and determined that they should not result in a violation of Texas Surface Water Quality Standards as required by CWA Section 401 and pursuant to 16 TAC §3.93 (Encl 5). Conditions for each NWP were defined in TxRRC’s water quality certification letter. Under Texas Natural Resource Code, Title 3, and the Texas Water Code, Chapter 26, the TxRRC has the responsibility for the prevention of pollution that might result from activities associated with the exploration, development, and production of oil, gas, or geothermal resources of the State.

TEXAS REGIONAL CONDITIONS

Dredge and Fill Activities in Lakes, Intermittent and Perennial Streams, and Special Aquatic Sites: For all activities subject to regulation under the CWA Section 404 in lakes, intermittent and perennial streams, and special aquatic sites (including wetlands, riffle and pool complexes, and sanctuaries and refuges), Pre-Construction Notification to the District Engineer is required in accordance with General Condition 32.

Suitable Fill: Use of broken concrete as fill or bank stabilization material is prohibited unless the applicant demonstrates that its use is the only practicable material (with respect to cost, existing technology, and logistics). Any applicant who wishes to use broken concrete as bank stabilization must provide notification to the District Engineer in accordance with General Condition 32 (Pre-Construction Notification) along with justification for such use. Use of broken concrete with rebar, used tires (loose or formed into bales), or car bodies is prohibited in all waters of the United States.

ADDITIONAL INFORMATION

The following provides additional information regarding minimization of impacts and compliance with existing General Conditions:

Permittees are reminded of General Condition 6 which prohibits the use of unsuitable material. Organic debris, building waste, asphalt, car bodies, individual tires, concrete jersey barriers, and trash are not suitable fill material.

General Condition 12 requires appropriate erosion and sediment controls (i.e., all fills must be permanently stabilized to prevent erosion and siltation into water and/or wetlands at the earliest practicable date). Streambed material or other small aggregate material placed along a bank as stabilization will not meet General Condition 12.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas