You can copy from here when filling out the rest of the page.
APPLICATION TO RE-ISSUE PERMIT
Berths 226-236 Everport Container Terminal Improvements Project
The applicant proposes to complete project elements in navigable waters of the U.S. that were not completed under the previous Department of the Army permit; the previous permit expired on February 14, 2021. Activities to be completed under a reissued permit include: approximately 30,400 cubic yards (cy) of dredging with disposal at LA-2, installation of structural wharf improvements along Berths 226-232, installation of approximately 65 linear feet of sheetpile to complete wharf stabilization, installation of five new cranes and raising of five existing cranes and installation of two alternative maritime power units on the wharf to allow electrification of ships at berth.