Home

Louisville District

Run scraper

On January 13

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

On January 13, 2021, the U.S. Army Corps of Engineers (Corps) published a final rule in the Federal Register (86 FR 2744) announcing the reissuance of twelve existing nationwide permits (NWPs) and four new NWPs, as well as the reissuance of 32 NWP general conditions and definitions with some modifications. These sixteen NWPs will go into effect on March 15, 2021, and will expire on March 14, 2026:

NATIONWIDE PERMITS FOR THE STATE OF OHIO U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM REISSUANCE AND ISSUANCE OF NATIONWIDE PERMITS 12, 21, 29, 39, 40, 42, 43, 44, 48, 50, 51, 52, 55, 56, 57 and 58 OHIO DEPARTMENT OF NATURAL RESOURCES CONSISTENCY DETERMINATION UNDER THE COASTAL ZONE MANAGEMENT ACT On January 13, 2021, the U.S. Army Corps of Engineers (Corps) published a final rule in the Federal Register (86 FR 2744) announcing the reissuance of twelve existing nationwide permits (NWPs) and four new NWPs, as well as the reissuance of 32 NWP general conditions and definitions with some modifications. These sixteen NWPs will go into effect on March 15, 2021, and will expire on March 14, 2026: • NWP 12 – Oil or Natural Gas Pipeline Activities • NWP 21 – Surface Coal Mining Activities • NWP 29 – Residential Developments • NWP 39 – Commercial and Institutional Developments • NWP 40 – Agricultural Activities • NWP 42 – Recreational Facilities • NWP 43 – Stormwater Management Facilities • NWP 44 – Mining Activities • NWP 48 – Commercial Shellfish Mariculture Activities • NWP 50 – Underground Coal Mining Activities • NWP 51 – Land-Based Renewable Energy Generation Facilities • NWP 52 – Water-Based Renewable Energy Generation Pilot Projects • NWP 55 – Seaweed Mariculture Activities • NWP 56 – Finfish Mariculture Activities • NWP 57 – Electric Utility Line and Telecommunications Activities• NWP 58 – Utility Line Activities for Water and Other Substances The twelve existing NWPs 12, 21, 29, 39, 40, 42, 43, 44, 48, 50, 51, and 52 published in the January 13, 2021 final rule replace the 2017 versions of these NWPs. The 2017 versions of NWPs 12, 21, 29, 39, 40, 42, 43, 44, 48, 50, 51, and 52 expire on March 14, 2021. There are 40 existing NWPs that were not reissued or modified by the January 13, 2021 final rule. Those 40 NWPs were published in the January 6, 2017, issue of the Federal Register (82 FR 1860) and those NWPs remain in effect until the Corps issues a final rule reissuing those NWPs or March 18, 2022, whichever comes first. The 40 2017 NWPs that remain in effect are: • NWP 1 – Aids to Navigation • NWP 2 – Structures in Artificial Canals • NWP 3 – Maintenance • NWP 4 – Fish and Wildlife Harvesting, Enhancement, and Attraction Devices and Activities • NWP 5 – Scientific Measurement Devices • NWP 6 – Survey Activities • NWP 7 – Outfall Structures and Associated Intake Structures • NWP 8 – Oil and Gas Structures on the Outer Continental Shelf • NWP 9 – Structures in Fleeting and Anchorage Areas • NWP 10 – Mooring Buoys • NWP 11 – Temporary Recreational Structures • NWP 13 – Bank Stabilization • NWP 14 – Linear Transportation Projects • NWP 15 – U.S. Coast Guard Approved Bridges • NWP 16 – Return Water From Upland Contained Disposal Areas • NWP 17 – Hydropower Projects • NWP 18 – Minor Discharges • NWP 19 – Minor Dredging • NWP 20 – Response Operations for Oil or Hazardous Substances • NWP 22 – Removal of Vessels • NWP 23 – Approved Categorical Exclusions • NWP 24 – Indian Tribe or State Administered Section 404 Programs • NWP 25 – Structural Discharges • NWP 27 – Aquatic Habitat Restoration, Establishment, and Enhancement Activities • NWP 28 – Modifications of Existing Marinas • NWP 30 – Moist Soil Management for Wildlife • NWP 31 – Maintenance of Existing Flood Control Facilities • NWP 32 – Completed Enforcement Actions • NWP 33 – Temporary Construction, Access, and Dewatering• NWP 35 – Maintenance Dredging of Existing Basins • NWP 36 – Boat Ramps • NWP 37 – Emergency Watershed Protection and Rehabilitation • NWP 38 – Cleanup of Hazardous and Toxic Waste • NWP 41 – Reshaping Existing Drainage Ditches • NWP 45 – Repair of Uplands Damaged by Discrete Events • NWP 46 – Discharges in Ditches • NWP 49 – Coal Remining Activities • NWP 53 – Removal of Low-Head Dams • NWP 54 – Living Shorelines The regional conditions for the 40 existing NWPs that were approved by the Great Lakes and Ohio River Division Engineer in 2017 remain in effect while these 2017 NWPs remain in effect. An integral part of the Corps’ Regulatory Program is the concept of NWPs authorizing regulated activities that result in no more than minimal individual and cumulative adverse environmental effects. NWPs are activity specific and are designed to relieve some of the administrative burdens associated with Section 10 of the Rivers and Harbors Act (Section 10) and/or Section 404 of the Clean Water Act (Section 404) permit processing for both the applicant and the federal government. The NWPs are issued by the Chief of Engineers and are intended to apply throughout the entire U.S. and its territories. Based on the recommendations provided by the Buffalo, Huntington, Louisville and Pittsburgh Districts (Districts), the Great Lakes and Ohio River Division (LRD) has approved regional conditions on the 2021 NWPs that are applicable in the State of Ohio. For convenience, all 2021 NWPs with the appropriate regional, general, and special conditions are attached. In addition to imposing regional conditions on certain NWPs, LRD has revoked NWP Nos. 52 (Water-Based Renewable Energy Generation Pilot Projects) within Lake Erie only, 55 (Seaweed Mariculture Activities) and 56 (Finfish Mariculture Activities) in the State of Ohio. Some regulated activities authorized by a NWP may proceed without notifying the Districts, as long as those regulated activities comply with all applicable terms and conditions of the NWPs, including regional conditions imposed by the Division Engineer. A non-reporting NWP may become a reporting NWP (requires the submittal of a Pre- Construction Notification (PCN) to the Districts in accordance with NWP General Condition 32) if the activity has the potential to affect a historic property (See NWP General Condition 20 and Regional General Condition 6b), federally-listed endangered or threatened species or their habitat (See NWP General Condition 18 and Regional General Condition 5a and 6a), waters of special concern (Regional General Conditions 4 and 5), National Wild and Scenic Rivers (See NWP General Condition 16 and Regional General Condition 6c)..Many of the proposed NWPs require advance notification (i.e. PCN) to the District Engineer before commencing regulated activities, to ensure that the regulated activities authorized by those NWPs cause no more than minimal individual and cumulative adverse environmental effects. The PCN must be made in writing as early as possible prior to commencing the proposed regulated activity. The notification procedures are described in NWP General Condition 32. The District Engineer may require a Section 10 and/or Section 404 Individual Permit for any regulated activity determined to have more than minimal adverse environmental effects, individually or cumulatively, on the aquatic environment or that would be contrary to the public interest (33 CFR 320.4). More information about the Corps’ Regulatory Program, including a fillable copy of the PCN form, is available at the following website: https://www.lrh.usace.army.mil/Missions/Regulatory/How-to-Apply-for-a-Permit/ The NWPs are not valid until the appropriate state agency certifies the discharge of dredged or fill material into waters of the U.S. does not violate state water quality standards or waives certification pursuant to 40 CFR § 121.9. The State of Ohio Section 401 Water Quality Certification has been waived for the 2021 NWPs. In addition, any state with a federally-approved Coastal Zone Management Act (CZMA) plan must agree with the Corps determination that the activities authorized by NWPs which are within, or will affect any land or water uses or natural resources of the state’s coastal zone, are consistent with the CZMA plan. The Ohio Department of Natural Resources (ODNR) concurred with the Corps Federal Consistency Determination on NWPs Nos. 21, 29, 40, 42, 43, 48, 50, 51, and 53, and imposed specific conditions on NWP No. 12. Activities which are NOT included in ODNR’s concurrence of the NWPs must obtain a project specific CZMA consistency determination from: Ohio Department of Natural Resources Office of Coastal Management 105 West Shoreline Drive Sandusky, Ohio 44870 (419) 626-7980 The NWPs provide a simplified, expeditious means of project authorization under the various authorities of the Corps. We encourage prospective permit applicants to consider the advantages of NWP authorization during the preliminary design of their projects. Assistance and further information regarding all aspects of the Corps’ regulatory program may be obtained by contacting: BUFFALO DISTRICT Address: U.S. Army Corps of Engineers, Buffalo District 1776 Niagara Street Buffalo, New York 14207Phone: (716) 879-4330 Fax: (716) 879-4310 HUNTINGTON DISTRICT Address: U.S. Army Corps of Engineers, Huntington District 502 Eighth Street Huntington, West Virginia 25701-2070 Phone: (304) 399-5210 LOUISVILLE DISTRICT Address: U.S. Army Corps of Engineers, Louisville District Post Office Box 59 Louisville, Kentucky 40201-0059 Phone: (502) 315-6691 PITTSBURGH DISTRICT Address: U.S. Army Corps of Engineers, Pittsburgh District William S. Moorhead Federal Building 1000 Liberty Avenue Pittsburgh, Pennsylvania 15222-4186 Phone: (412) 395-7155

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas