SWG-2016-00832 - LBC Houston

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant requests an extension of time. Public Notice SWG-2016-00832 is ready to be posted; the files are on the S:Drive. The files are: (1) PN.201600832.pdf (5 pages) and (2) Plans.201600832.pdf (7 pages). Let me know if you have any problems. Thank you!

SWG-2016-00832 - LBC Houston, L.P. - Bayport Ship Channel - Harris County, Texas

The applicant requests an extension of time.

Comments Due: 21 April 2021

PROJECT DESCRIPTION: The applicant requests an extension of time to conduct maintenance dredging activities to previously authorized depths for all docks at the LBC Houston, L.P. terminal (Ship Docks 1-5 and Barge Docks 1-5), until 31 December 2030. All maintenance dredge material is proposed to be placed within existing confined placement areas, as previously authorized. Maintenance dredging depths for Ship Docks 1 and 2 would be -41.57 feet Mean High Water (MHW), while maintenance dredging depths for Ship Docks 3, 4 and 5 would be -45.57 feet MHW +2-foot overdredge. The maintenance dredge depths for all of the LBC Barge Docks (1-5) would be -16 feet MHW. The applicant’s plans are enclosed in 7 sheets.

Full Public Notice Project Plans

PROJECT DESCRIPTION: The applicant requests an extension of time to conduct maintenance dredging activities to previously authorized depths for all docks at the LBC Houston, L.P. terminal (Ship Docks 1-5 and Barge Docks 1-5), until 31 December 2030. All maintenance dredge material is proposed to be placed within existing confined placement areas, as previously authorized. Maintenance dredging depths for Ship Docks 1 and 2 would be -41.57 feet Mean High Water (MHW), while maintenance dredging depths for Ship Docks 3, 4 and 5 would be -45.57 feet MHW +2-foot overdredge. The maintenance dredge depths for all of the LBC Barge Docks (1-5) would be -16 feet MHW. The applicant’s plans are enclosed in 7 sheets.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas