The applicant is proposing to remove a segment of an 8-inch pipeline.
Full Public Notice Project plans
PROJECT DESCRIPTION: The applicant is proposing to remove a segment of an 8-inch pipeline and decommission in place the remaining segment. Specifically, the applicant proposes to excavate approximately 16,398 cubic yards of the sea floor to facilitate the removal of a segment of an 8-inch pipeline crossing the Sabine Bank Channel at Station 82+800 to the limits of the standard channel set-back. The excavated material will be spread on both sides of the pipe trench so not to raise the sea floor elevation. The applicant states that the remaining pipe east of the channel will be decommissioned in place. The remaining pipe west of the channel will also be decommissioned in place. The purpose of the proposed activity is to remove the existing pipeline segment crossing the Sabine Bank Channel to accommodate navigation improvements associated with the Sabine-Neches Waterway Improvement Project.