You can copy from here when filling out the rest of the page.
Section 408 permit application from City of Los Angeles Bureau of Sanitation, through the Los Angeles County Flood Control District, to the U.S. Army Corps of Engineers to install a water quality monitoring station on the bank of Ballona Creek Channel immediate west of the South Fairfax Avenue Bridge in the City of Los Angeles, Los Angeles County, California.
Construction to expand the size of existing concrete pad to accommodate new enclosure of existing autosampler at the same location. The purpose of the project is to comply with the Ballona Creek Watershed Coordinated Integrated Monitoring Program as required by the Los Angeles Regional Water Quality Control Board.