The Tennessee Valley Authority is pulling a new fiber line across the Tennessee River at mile marker 345 May 13

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The Tennessee Valley Authority is pulling a new fiber line across the Tennessee River at mile marker 345 May 13, 2021. TVA plans to pull the old fiber line down May 16.

The Tennessee Valley Authority is pulling a new fiber line across the Tennessee River at mile marker 345 May 13, 2021. TVA plans to pull the old fiber line down May 16. Two patrol boats will be on site to warn recreational and commercial vessels, and may need to stop traffic briefly. However, river traffic should not be significantly impacted. This should be a one-day operation each day from 6 a.m. to 7 p.m. Warning signs will be placed at all boat ramps within a few miles of the work location. Depending on weather, these dates could change plus or minus a few days in either direction. Therefore, all boats are cautioned to be aware of these operations during this period. Call Shane Carman at 256-314-7840 or e-mail cscarman@tva.gov for more information.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas