Home

St. Louis District

Run scraper

The Corps of Engineers (Corps) is proposing changes in GP-34M. Therefore

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The Corps of Engineers (Corps) is proposing changes in GP-34M. Therefore, comments are solicited on the reissuance of the GP with the proposed changes, or reissuance with proposed modifications.

Proposed changes include:

- Special condition d: The Corps is proposing to increase the diameter at breast height (DBH) of woody vegetation that shall be protected, via gravel buffer, from 1 ½-inch to 3-inch.

- The Corps is proposing to remove the Project Authorization Page entirely from the GP

Written comments must be submitted by replying to this email or by mailing your comments Mr. James Reenan, Regulatory Specialist; U.S. Army Corps of Engineers, Missouri State Regulatory Office, 515 East High Street, Suite 202, Jefferson City, MO 65101; telephone: 816 389 3832, or via e-mail at james.s.reenan@usace.army.mil. The Public Notice comment period opens May 14, 2021 and closes June 3, 2021.

The Corps of Engineers (Corps) is proposing changes in GP-34M. Therefore, comments are solicited on the reissuance of the GP with the proposed changes, or reissuance with proposed modifications.

Proposed changes include:

Special condition d: The Corps is proposing to increase the diameter at breast height (DBH) of woody vegetation that shall be protected, via gravel buffer, from 1 ½-inch to 3-inch.

The Corps is proposing to remove the Project Authorization Page entirely from the GP

Written comments must be submitted by replying to this email or by mailing your comments Mr. James Reenan, Regulatory Specialist; U.S. Army Corps of Engineers, Missouri State Regulatory Office, 515 East High Street, Suite 202, Jefferson City, MO 65101; telephone: 816‑389‑3832, or via e-mail at james.s.reenan@usace.army.mil. The Public Notice comment period opens May 14, 2021 and closes June 3, 2021.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas