You can copy from here when filling out the rest of the page.
STATE - West Virginia
APPLICANT - Alpha Met Resources
PROJECT PURPOSE - The applicant has requested a DA permit to discharge dredged and/or fill material into a total of 18,420 linear feet (1.87 acres) of stream channels and 1.79 acres of wetlands, in conjunction with the construction, operation and reclamation of the Turkeyfoot Surface Mine.
TO WHOM IT MAY CONCERN: The following application has been submitted for a Department of the Army (DA) Permit under the provisions of Section 404 of the Clean Water Act for the proposed discharge dredged and/or fill material into waters of the United States (U.S.).
APPLICANT: Jeremy Crist
Alpha Met Resources
Post Box Office 69
Pax, West Virginia 25904
LOCATION: The proposed project would be located approximately 2.9 miles south of the community of Clear Creek, in Raleigh County, West Virginia at latitude 37°52’29” and longitude -81°11’19”. The proposed surface mine would be constructed in McGraw Fork, Workman Creek and its unnamed tributaries, Wingrove Branch and its unnamed tributaries, unnamed tributaries of Stover Fork, and palustrine emergent (PEM) wetlands adjacent to Workman Creek. All of the streams are indirect tributaries of Clear Fork Creek and Marsh Creek, which flows into the Big Coal River, a traditional navigable water of the U.S. See attached Sheets 1 and 2 for a depiction of the proposed project location.
DESCRIPTION OF THE PROPOSED WORK: The applicant has requested a DA permit to discharge dredged and/or fill material into a total of 18,420 linear feet (1.87 acres) of stream channels and 1.79 acres of wetlands as indicated on attached Sheets 3-17 and Table 1 and as described below, in conjunction with the construction, operation and reclamation of the Turkeyfoot Surface Mine. The activities would include re-mining of existing pre-law contour areas via area, contour, and highwall mining methods.
Valley Fill No. 1 and Sediment Ponds 1A and 1B: The construction of Valley Fill No. 1 and its associated durable rock underdrain would result in the permanent discharge of approximately 496 cubic yards of non-toxic, durable rock fill material into 3,809 linear feet (0.623 acre) of McGraws Fork and five (5) intermittent segments of McGraw Fork. The construction of Sediment Ponds 1A and 1B would proceed prior to the construction of the valley fill, and would be located below a reclaimed refuse area. Water from the toe of Valley Fill 1 would be diverted through an existing diversion ditch associated with the reclaimed refuse area. There would be no discharges of dredged and/or fill material into waters of the U.S. in conjunction with the diversion ditch and Sediment Pond 1B. The construction of Sediment Pond 1B would result in the temporary discharge of 61.3 cubic yards of earthen fill into 209 linear feet (0.038 acre) of an intermittent tributary of McGraw Creek to construct the embankment associated with Sediment Pond 1B. Sediment Pond 1A would be located outside of waters of the U.S. Construction of the valley fill would occur once the ponds have been constructed and certified.
Valley Fill No. 2, Sediment Pond No. 2, and Access Road 2: The construction of Valley Fill No. 2 and its associated durable rock underdrain would result in the permanent discharge of approximately 489 cubic yards of non-toxic, durable rock fill material into 1,640 linear feet (0.137 acre) of one (1) intermittent segment of Stover Fork and two (2) intermittent tributaries of Stover Fork. The construction of Sediment Pond No. 2, which would be located below the toe of Valley Fill No. 2, would result in the temporary discharge of approximately 856 cubic yards of clean earthen and rock fill material into 845 linear feet (0.147 acre) of one (1) intermittent stream channel and 0.27 acre of PEM wetland (WL-SF3) in conjunction with the construction of the embankment structure for the pond. The construction of the infrequently used Access Road #2 (IUAR #2) would result in the temporary discharge of 44 cubic yards of durable, non-toxic material and two (2) 36” culverts into 119 linear feet (0.015 acre) of one (1) intermittent tributary of Stover Fork. Construction of the valley fill would occur once the pond has been constructed and certified.
Valley Fill No. 3, Sediment Pond 3, and Access Road 3 and 3A: The construction of Valley Fill No. 3 and its associated durable rock underdrain would result in the permanent discharge of approximately 463 cubic yards of non-toxic, durable rock fill material into 3,660 linear feet (0.38 acre) of one (1) perennial segment of the Right Fork of Workman Creek and 1,540 linear feet (0.106 acre) of four (4) intermittent tributaries of the Right Fork of Workman Creek. The construction of Sediment Pond No. 3, which would be located below the toe of Valley Fill No. 3, would result in the temporary discharge of approximately 57 cubic yards of clean earthen and rock fill material into 605 linear feet (0.06 acre) of one (1) perennial segment of the Right Fork of Workman Creek and 18.7 cubic yards of clean earthen and rock fill material into 360 linear feet (0.03 acre) of one (1) intermittent segment of the Right Fork of Workman Creek (NAME). The construction of the pond would also result in the excavation of 1.52 acres of one (1) PEM wetland. The construction of the infrequently used Access Road #3 (IUAR #3) would consist of two (2) separate road crossings. The first road crossing would result in the temporary discharge of 1.79 cubic yards of durable, non-toxic material and the installation of one (1) 36” culvert into 70 linear feet (0.003 acre) of one (1) intermittent tributary of the Right Fork of Workman Creek. The second road crossing would result in the temporary discharge of 3.11 cubic yards of durable, non-toxic material and the installation of one (1) 36” culvert into 70 linear feet (0.004) of one (1) intermittent segment of the Right Fork of Workman Creek. Construction of the valley fill would occur once the pond has been constructed and certified.
Valley Fill No. 4, Sediment Pond 4, and Stream Crossings 1-5 associated with Access Road 4: The construction of Valley Fill No. 4 and its associated durable rock underdrain would result in the permanent discharge of approximately 63 cubic yards of non-toxic, durable rock fill material into 3,797 linear feet (0.19 acre) of an five (5) intermittent tributaries of Wingrove Branch. The construction of Sediment Pond No. 4, which would be located below the toe of Valley Fill No. 4, would result in the temporary discharge of approximately 32 cubic yards of clean earthen and rock fill material into 1,316 linear feet (0.10 acre) of three (3) intermittent tributaries of Wingrove Branch. The construction of Stream Crossings 1 and 2 would result in the temporary discharge of 96.8 cubic yards of durable, non-toxic material into 140 linear feet (0.03 acre) of one (1) perennial tributary of Wingrove Branch to construct two (2) in-stream drive-through stream crossings. The construction of Stream Crossings 3, 4, and 5 would result in the temporary discharge of approximately 44 cubic yards of durable, non-toxic fill material into 240 linear feet (0.039 acre) of three (3) intermittent tributaries of Wingrove Branch. Each crossing would affect 80 linear feet of stream channel. Construction of the valley fill would occur once the ponds have been constructed and certified.
For the construction of each valley fill, after the completion of the sediment pond construction, the toe/foundation would be prepared and the areas of the fills would be progressively cleared of vegetation. The face of the valley fill construction and installation of the terraces would commence at this time. The face construction and reclamation would occur from the bottom of the fill up with progressive construction of terraces and permanent drainage in dumping increments not to exceed 100 feet. The outer slope or face of the valley fills would not exceed a vertical slope of 2:1 with terraces constructed at a maximum of 50 feet above the toe of the valley fill. The bench width of each terrace would be no less than 20 feet wide with a three (3) to five (5) percent slope toward the face of the valley fill and a one (1) percent slope toward the groin ditch. All materials placed into the valley fills would be durable rock consisting of a minimum of 80% by volume sandstone, limestone, and other rock that does not slake in water. Non-cemented rock, such as clay, shale, etc., would be mixed with durable rock spoil in such a manner as to limit unit concentrations of non-cemented rock. All fill material would be generated on-site by drilling and blasting of overburden. As the fills are constructed, topsoil or an approved topsoil substitute would be spread over the completed slope and bench areas and seeded/mulched per the re-vegetation plan included in the approved Surface Mining Control and Reclamation Act (SMCRA) permit. The re-mining activities at the site would reclaim approximately 394 acres and 85,794 linear feet of un-reclaimed pre-law highwall at the site.
The purpose of the project is to remove approximately 11.2 million tons of metallurgical coal reserves within the 1086-acre SMCRA permit area. The proposed surface mine operation would use a combination of area, contour, and highwall mining techniques to recover the coal reserves. The mining plan, inclusive of reclamation, would occur over a period of eight (8) years. The post-mine land use is forestland. The applicant has applied to the West Virginia Department of Environmental Protection (WVDEP) for the required SMCRA permit (S-3014-19). Plans of the proposal are attached to this notice (Sheets 1-17). A copy of the application, including all supplemental materials (alternative analysis, compensatory mitigation plan, environmental information documents, etc.), is available for review in the Huntington District Office, by appointment, or via the Freedom of Information Act.
ALTERNATIVE ANALYSIS: Approximately 18,420 linear feet (1.87 acres) of stream channels and 1.79 acres of two (2) PEM wetlands are proposed to be permanently and temporarily filled as a result of the mining activities. No other special aquatic sites would be affected by the discharge of dredged and/or fill material. No permit will be issued unless the alternatives analysis clearly demonstrates that practicable upland alternatives are not available to achieve the overall project purpose. The applicant has submitted the required alternative analysis for review. A complete copy of the applicant’s submittal can be reviewed, by appointment, at the above address or a copy may be requested under the Freedom of Information Act.
AVOIDANCE AND MINIMIZATION: In evaluating a project area containing waters of the U.S., consideration must be given to avoiding impacts on these sites. If waters of the U.S. cannot be avoided, then impacts must be minimized. Approximately 43,481 linear feet of perennial and intermittent stream channels and 2.45 acres of PEM wetlands exist at the site as determined by an Approved Jurisdictional Determination dated December 3, 2020. The applicant indicated the proposed project cannot be located in an area that would avoid all discharges of dredged and/or fill material into waters of the U.S. The applicant stated the mine plan and developmental sequence were designed to avoid and minimize the discharge of dredged and/or fill material into waters of the U.S. to the maximum extent practicable, while meeting the stated project purpose. The proposal would avoid discharges of dredged and/or fill material into 25,061 linear feet (42%) of intermittent and perennial streams and 0.58 acre (76%) of wetlands at the site. The applicant indicated the entire proposed project footprint and adjacent areas have been previously affected by pre-law surface mining. The total project site, which is 1,086 acres in size includes over 394 acre of un-reclaimed pre-law surface mining, which comprises 37% of the project area. In addition, approximately 85,794 linear feet of un-reclaimed pre-law highwall exists at the site and is producing large sediment loads within the receiving streams. The applicant has utilized the U.S. Department of Agriculture (USDA) Universal Soil Loss Equation to estimate the current and post-mining reclaimed sediment yields and has concluded that re-mining and reclaiming the pre-law highwalls and surface area would reduce the annual sediment yield emanating from the site from its current 8,207 tons per year to 5.26 tons per year (after site reclamation and re-vegetation). The applicant has avoided discharges of dredged and/or fill material into undisturbed watersheds at the site and the streams proposed for discharge of fill material have been previously affected by the pre-SMCRA mining activities. The applicant has designed the proposed valley fills to be over-stacked to increase their storage volume without resulting in additional impacts to waters of the U.S. Construction of the valley fills would be sequential and proceed from the toe of the fill up, which minimizes the length of time that overburden materials are exposed to runoff and weathering. A special material handling plan has been developed by the applicant and would assure that all fill material discharged into waters of the U.S. would be managed and monitored pursuant to the required Section 402 National Pollutant Discharge Elimination System permit (issued by the WVDEP) during all phases of the proposal to ensure water quality standards are met. Site reclamation would occur contemporaneously and would be sequenced to reduce total land disturbance. No more than 50% of the permitted acreage or 200 acres, whichever is less, would be disturbed and/or un-reclaimed at anyone (1) time. At all times, best management practices and guidance from the “Technical Handbook of Standards and Specifications for Mining Operations in West Virginia” would be employed during all phases of the proposed mining and reclamation activities. After mining and reclamation, the stream segments associated with the sediment pond would be re-established and the area would be returned to a post-mining land use of forestland.
COMPENSATORY MITIGATION PLAN (CMP): The applicant has submitted a CMP to compensate for the unavoidable discharge of fill material into waters of the U.S. The applicant proposes to establish, re-establish, restore, and preserve approximately 26,633 linear feet of perennial and intermittent stream channels and 4.1 acres of PEM wetlands on and off-site as described below (See attached Sheets 6-15).
On-Site Stream Re-establishment at Sediment Ponds 1-4 and Temporary Access Roads: Upon completion of the mining, reclamation, and removal of the sediment control structures and culverted road crossings at the site, the applicant would re-establish a total of 4,062 linear feet of nine (9) intermittent stream channels (UNT Workman Branch, SF8R5L, SF8R6L, SF8R,WC-1, WC-2, W-6, W-7, and W-3) at the location of the four (4) sediment ponds and a total of 499 linear feet of intermittent stream channels (SF8R3L, WC-3, WC-4, W-3) and 140 linear feet of perennial stream channels (WC-1) at the locations of the nine (9) access roads. The hydrology of the re-established stream channels are expected to be the same as the pre-project stream channels and exhibit similar drainage patterns. The post-project re-establishment channels would also take advantage of the re-graded drainage patterns, slopes, precipitation induced run-off, and pre-project groundwater zones. A total of 4,701 linear feet of intermittent and perennial stream channels would be re-established on-site. A minimum 100-foot riparian buffer, 50 feet from the top of each bank, would be established along the stream channels.
Workman Creek (WC-1) On-Site Stream Establishment: Upon completion of mining and reclamation activities at the site, the applicant would establish approximately 2,835 linear feet of perennial stream channel along the eastern perimeter of Valley Fill No. 3. Currently, at the head of Workman Creek, a perennial seep exists within the Eagle A mine void that was created during pre-SMCRA mining activities. The seep would be avoided during the surface mining activities to ensure continued flow. Upon completion of the mining activities, the water from the seep would be directed across the re-grade within a straight stream corridor for approximately 1,400 linear feet above the valley fill, would then flow into the groin ditch along the edge of the valley for approximately 1,100 linear feet, and then into an established channel for approximately 385 linear feet into the re-established section of Workman Creek associated with Sediment Pond No. 3. For the first 1,400 linear feet, starting at the seep, the stream is proposed as a Rosgen B-type stream channel with a four (4) foot bottom width, eight (8) foot bankfull width, and 2:1 side slopes at a 1.5% slope. For the remaining 1,435 linear feet, the stream is proposed as a Rosgen A-type stream channel with a four (4) foot bottom width, eight (8) foot bankfull width, and 2:1 slopes at a 35% slope. The established streams would have a contributing watershed of 40.9 acres. The channel would be lined with a 60-mil thick high density polyethylene (HDPE) geo-membrane. The applicant proposes to install pools within the stream channel created through the use of J-hooks. A minimum 100-foot riparian buffer, 50 feet from the top of each bank, would be established along the stream channel.
McGraw Fork East Off-Site Stream Establishment, Restoration, and Preservation: Upon initiation of the mining activities at the proposed Turkeyfoot Surface Mine, the applicant would establish, restore, and preserve approximately 7,935 linear feet of stream channels at the McGraw East Mitigation Site, which is located northeast of Valley Fill No. 1. This site currently contains an abandoned refuse fill (McGraws Hollow Refuse Fill - O-0125-83). The applicant proposes to establish two (2) intermittent stream channels (WH-1 and UNT Workman Creek) totaling 2,447 linear feet, restore seven (7) intermittent stream channels (WH1-1, UNT Workman Creek, , MC-K, MC-L, MC-1, ) totaling 5,158 linear feet, and preserve one (1) intermittent stream channel (WH1-1) totaling 330 linear feet along the eastern side of the refuse fill.
The stream restoration activities, which are proposed for Streams WH1, WH1.1, MC-K, MC-L, MC-I, and McGraw East 2, would include the creation of step-pools, the stabilization of the banks, the removal of non-native vegetation, planting native temporary herbaceous vegetation and permanent woody vegetation to establish a 100-foot riparian buffer, 50-feet from the top of each bank, along each restored stream channel. Old logging roads, which run parallel to the stream channels, would be vegetated and stabilized to limit further sediment loads into downslope areas. The stream restoration activities within the channel of McGraw East 2, which is a previously established stream channel that collects water from several tributaries (MC-L, MC-K, MC-J, and MC-I) and takes the flow around the edge of the refuse fill, is to connect the channel of McGraw East 1 to allow continued water flow to Streams WH1.1 and WH1, and into Workman Creek without allowing water flow over or through the refuse fill. The channel would be restored by the creation of step-pools, the stabilization of the banks, the removal of non-native vegetation, and the planting of native temporary herbaceous vegetation and permanent woody vegetation to establish a 100-foot riparian buffer, 50-feet from the top of each bank, along the restored stream channel. The upper 300 linear feet of Stream WH1.1 would be preserved.
The stream establishment activities are proposed within the channels of McGraw East 1 and McGraw East 3. The stream establishment work within the channel of McGraw East 1 would begin at its confluence with Stream WH1.1 (the receiving stream) and would continue for 1,532 linear feet upstream. The stream channel would be established in an area once used to convey water around the refuse fill but is no longer in use. Water flow from Streams MC-L and MC-J would be diverted into the newly established stream channel. The channel is proposed as a Rosgen Ba-type channel with a 15 foot bottom width, 25 foot bankfull width, and 2:1 side slopes at a 5.0% slope. The bed would be dominated by cobble substrate. The stream would have a drainage area of 86 acres. The applicant proposes to install step-pools, bankfull benches, and temporary herbaceous and permanent woody vegetation within the 100-foot riparian buffer, 50 feet from the top of each bank. The stream establishment work within the channel of McGraw East 3 would begin at the confluence of McGraw East 2 and Stream MC-I and would continue 915 linear feet upstream and would follow the hillslope to an area where another hollow begins. The hollow contains a series of three (3) old ponds connected by an intermittent stream. Three (3) ponds would be incorporated into the established 915 linear feet of channel within McGraws East 3. The first upstream 515 linear feet of the established stream channel would have a slope of 19% until it intersects with an old bench and would then have a slope of 6% until its confluence with McGraws East 2. The upper reach of the channel is proposed as a Rosgen Aa-type channel with a 15-foot bottom width, 21-foot bankfull width, and 2:1 side slopes. The lower reach 400 linear feet of the channel is proposed as a Rosgen A-type channel with 15- foot bottom width, 24 foot bankfull width, and 2:1 side slopes. The channels would be lined with a 60-mil HDPE geo-membrane. The bed would be dominated by cobble substrate. The streams would have a combined drainage area of 72 acres.
McGraw Fork West Off-Site Stream Establishment and Restoration: Upon completion of the mining and reclamation activities at the Turkeyfoot Surface Mine, the applicant would establish and restore approximately 3,950 linear feet of stream channel at the McGraw West Mitigation Site, which is located on the western side the McGraws Hollow Refuse Fill and below the toe of Valley Fill No. 1. The applicant proposes to establish two (2) intermittent stream channels (McGraws Fork and UNT McGraws Fork totaling 3,009 linear feet and restore two (2) intermittent stream channels (MC-g and MC-H totaling 941 linear feet along the western side of the refuse fill.
The stream restoration activities, which are proposed for Streams MC-G and MC-H, would include the creation of step-pools, the stabilization of the banks, the removal of non-native vegetation, and the planting of native temporary herbaceous vegetation and permanent woody vegetation to establish a 200-foot riparian buffer, 100-feet from the top of each bank, along each restored stream channel. Old logging roads, which run parallel to the stream channels, would be vegetated and stabilized to limit further sediment loads into downslope areas.
The stream establishment activities are proposed within the channels McGraw West 1 and McGraw West 2. The stream establishment work within the channel of McGraw West 1 would begin at the toe of Valley Fill No. 1 and would continue for 1,959 linear feet downstream to its confluence with Workman Creek. The initial 1,100 linear feet of stream channel is proposed as Rosgen B-type channel with a slope of less than 1% and the remaining 859 linear feet is proposed a Rosgen A or B-type channel with a slope of nearly 20%. The channel would have a with a 25-foot bottom width, thirty-four (34) foot bankfull width, and 2:1 side slopes. The channel would be lined with a 60-mil HDPE geo-membrane. The streambed would be dominated by boulder and cobble substrate. The applicant proposes to install step-pools, bankfull benches, and temporary herbaceous and permanent woody vegetation within the 100-foot riparian buffer, 50 feet from the top of each bank. The stream would have a drainage area of 107 acres. The stream establishment work within the channel of McGraw West 2 would begin just below the confluence of the established McGraw East 2 and McGraw East 1 channels and flow 1,050 linear feet west to the McGraw West 1 established channel. The drainage area at the beginning of the established McGraw West 2 channel would be less than one (1) acre; however, it would receive overland flow and drainage off the surface of the refuse fill. The channel is proposed as a Rosgen B-type channel with a slope of 2.8%, a 25-foot bottom width, 30 foot bankfull width, and 2:1 side slopes. The channel would be lined with a 60-mil HDPE geo-membrane. The streambed would be dominated by cobble and gravel substrate. The established stream channel would have a 100-foot riparian buffer, 50-feet from the top of each bank. The stream would have a drainage area of 12.7 acres.
Stover Fork Off-Site Stream Establishment and Restoration: Within the construction season following initiation of the proposed discharges of dredged and/or fill material into waters of the U.S. at the site, the applicant would establish and restore approximately 6,742 linear feet of stream channel at the Lower Right Fork Stover Fork Mitigation Site, which is located southeast of Valley Fill No. 1.
The stream restoration activities are proposed along 5,834 linear feet of an unnamed tributaries of Stover Fork (SF2R-Lower, SF2R-Upper, SF2R-A, SF2R-B, SF2R-C, SF2R-D, SF2R-3R, and SF2R-4R). The restoration activities would commence on the main stem of the unnamed tributary of Stover Fork approximately 1,000 linear feet upstream of its confluence with Stover Fork and would restore 2,925 linear feet of the main channel and 2,889 linear feet of tributaries to the Stover Fork. Through this reach, an access road runs along the right descending bank of the main stem and then crosses the stream near station 25+00 (from the confluence with Stover Fork) and continues up along the left descending bank. The stream flows through three (3) separate washed-out pond areas which were created during pre-SMCRA mining activities. The stream restoration activities would include the removal of the washed out pond areas and in-stream road crossings as well as the creation of new stream dimensions to provide both pool and riffle habitats as well as to provide access to the floodplain, especially in the lower reach of the main stem. The restoration activities would also include the creation of step-pools, the stabilization of the banks, the removal of non-native vegetation, and the planting of native temporary herbaceous vegetation and permanent woody vegetation to establish a 100-foot riparian buffer, 50-feet from the top of each bank, along the restored stream channel. The stream would have a slope of 10% and a drainage area of approximately 200 acres.
The stream establishment activities are proposed to establish 906 linear feet of four (5) intermittent channels (SF2R-A, SR2R-B, SF2R-C, SF2R-D, SR2R-4R) to allow the re-connection of more than 2,100 linear feet of currently disconnected stream channel back to an unnamed tributary of Stover Fork. These small intermittent streams were disconnected by logging roads in the area. Each established stream channel would be designed as a Rosgen A-type channels. The channel bottom widths would be one (1) feet while the bankfull widths would be six (6) feet. The established channels would have 2:1 side slopes. The channels would be lined with a 60-mil HDPE geo-membrane. The streambeds would be dominated by boulder and cobble substrate. The applicant proposes to install step-pools, bankfull benches, and temporary herbaceous and permanent woody vegetation within the 100-foot riparian buffer, 50 feet from the top of each bank. The streams would have an average slope of five (5) percent and a drainage area of 184 acres.
All of the stream established and restored stream channels associated with this proposed CMP have been designed and would be constructed utilizing natural stream design techniques to ensure proper entrenchment ratios, pool to pool spacing, width to depth ratios, substrate sizing, and adequate riparian species to established stable step-pool systems found naturally thought the affected watersheds. The stream channels would include a primary channel within a larger, secondary flood-prone channel based on regional hydrology curves to ensure that the streams would pass normal and expected high flows. All of the riparian buffers would include native, non-invasive tree, shrub, and herbaceous species commonly found with the State of West Virginia.
Off-Site Wetland Establishment: To offset the loss of 1.79 acres of two (2) PEM wetlands associated with the construction of Sediment Ponds No. 2 and No. 3, the applicant proposes to establish 4.1 acres of PEM wetlands off-site along the bank of the mainstem of Stover Fork. The wetland establishment activities would occur during the construction season following initiation of the proposed discharges of dredged and/or fill material into waters of the U.S. at the site. The wetlands, which would consist of four (4) separate wetland cells, would be constructed within the floodplain of Stover Fork, a perennial stream channel. An intermittent tributary of Stover Fork (SF1LA) is also within the floodplain area. Stover Fork flows along the western and northern perimeter of the proposed wetland cells while the unnamed tributary enters the floodplain form the southeast. The construction of the cells would include grading the area to create slightly depressed areas to contain the wetland cells. Micro-topography would be incorporated into each cell to create areas of differing elevations to allow for both saturated and inundated conditions. Embankments would be constructed along the northern perimeter of the wetland cells and would be one (1) foot high. Six (6) inches of compacted clay soils would line the wetland cells. The inlet/outlet structures would be constructed within the embankment structures at an elevation of six (6) inches below the top of the embankment along the norther perimeter of each of the cells. The most northern wetland cell would connect to Stover Creek along the northern perimeter of the wetland establishment site. The outlets are designed to discharge from wetland to wetland. When Stover Creek is above normal flow levels, it would overflow into the wetland cells. It is anticipated that the wetlands would have a minimum of six (6) inches of inundation up to one (1) foot of inundation during overflow periods. The wetland planting schematic would be separated into deep water areas and shallow areas. The deep-water areas would be planted with plugs or rhizomes at least two (2) of the following species: pickerelweed (Pontederia cordata), arrowhead (Sagittaria latifolia), bulrush (Scripus validus), and burred (Spaganium eurycarpum). The shallow water areas and saturated areas would be planted with one (1) or more of the following Ernst seed mixes: FACW Wetland Meadow Mix, Seasonally Flooded Wildlife Food Mix, Specialized Wetland Mix for Shaded OBL-FACW Areas, and/or Eastern West Virginia FACW Wetland Mix. The wetland hydrology would be driven by a combination of overflow from Stover Fork, Stream SF1LA, and precipitation. The wetland would be classified as PEM.
All of the mitigation stream channels would be constructed utilizing natural stream channel design techniques, substrate restoration, in-stream habitat structures, bank stabilization, and the establishment of a vegetated riparian buffer zone. Long-term site protection would be provided for all of the mitigation stream channels and wetland. The applicant’s compensatory mitigation plan includes a 10-year monitoring and adaptive management plan, including success performance standards, to assess the success of the mitigation sites using geomorphic, biological, and habitat assessment tools.
To calculate an appropriate amount of mitigation to compensate for the loss of waters of the U.S. associated with the proposed project, the applicant used the Corps’ West Virginia Stream and Wetland Valuation Metric (SWVM, Version 2.1). The SWVM compares baseline data with anticipated or actual post-mitigation data to calculate impact debits and mitigation credits. The impact debits for the proposed surface mine total 13,860.91. The applicant’s proposed on and off-site stream and wetland mitigation work is predicted to produce 17,576.34 stream mitigation credits. The applicant’s CMP is currently under review and is available for public review. The proposed CMP is open to comment and is subject to change based on comments received. After review of all the submitted information the Corps will make a determination of appropriate mitigation, in the event a decision is made to issue a permit.
WATER QUALITY CERTIFICATION: The applicant must obtain a Section 401 Water Quality Certification (WQC) from the WVDEP assuring that applicable laws and regulations pertaining to water quality are not violated. A DA permit, if otherwise warranted, would not be issued for this project until the Section 401 WQC has been issued or waived and the 401(a)(2) process as described in the “Clean Water Act Section 401 Certification Rule” (Rule, 85 Federal Register 42,210 [July 13, 2020]) has been completed. The applicant has submitted the required Section 401 WQC application to the WVDEP and in an email dated March 12, 2021, the WVDEP indicated the complete Section 401 WQC application is currently under evaluation.
HISTORIC AND CULTURAL RESOURCES: The National Register of Historic Places (NRHP) has been consulted and it has been determined there are no properties currently listed on the NRHP that would be indirectly or directly affected by the proposed work. In a letter dated April 17, 2015 to the WVDEP regarding this proposal, the West Virginia Division of Culture and History (WVDCH) indicated that 69 architectural structures older than 50 years old have been identified within a one-mile study area. The WVDCH stated that none of the structures were listed or are eligible for the NRHP. The WVDCH further stated they reviewed an abbreviated technical report prepared by Apogee Environmental & Archeological, Inc., (Apogee) and did not identify any archaeological or cultural resources. The WVDCH concluded the no historic or archaeological resources would be affected by the proposed project and no further consultation would be necessary with their office with respect to historic resources. Apogee also provided information regarding cemetery resources within the project area. The report identified six (6) cemeteries in the project area and one (1) cemetery outside of the project area. The WVDCH determined that the six (6) cemeteries in the project area are no listed on or eligible for the NRHP and that the cemetery located outside of the project area is located too far from the proposes surface mine to be adversely impacted directly or indirectly by the proposed mining activities. The WVDCH concluded no further consultation with their office is necessary regarding these resources. The WVDCH stated no further consultation regarding historic or archaeological resources is required for the proposal. This Public Notice serves as coordination with the WVDCH, pursuant to Section 106 of the National Historic Preservation Act of 1966. No DA permit will be issued until all obligations under Section 106 of the National Historic Preservation Act of 1966 have been fulfilled.
ENDANGERED/THREATENED SPECIES: The proposal lies within the range of the endangered gray bat (Myotis gresescens), the endangered Indiana bat (Myotis sodalis), and the threatened northern long-eared bat (Myotis septentrionalis). The site is located within a known hibernaculum buffer of the Indiana bat; therefore, the applicant prepared a Protection and Enhancement Plan (PEP) for the federally listed Indiana bat and threatened northern long eared bat. The applicant followed the “Range-wide Indiana bat Protection and Enhancement Plan Guidelines for Surface Coal Mining Operations” (Guidelines). The applicant submitted the PEP to the WVDEP for their review and comment in March 2020. The WVDEP stated that the PEP includes non-discretionary Reasonable and Prudent Measures to avoid and minimize impacts in the Indiana bat and the northern long-eared bat. The WVDEP stated winter clearing in the SMCRA permit area must only be conducted between November 15 to March 31. Since the applicant has chosen to adhere to the timber clearing restrictions, the WVDEP determined the PEP fulfills all requirements, including the Guidelines and the Key 4(d) Rule, necessary to protect threatened and endangered species. This Public Notice serves as coordination with the U.S. Fish and Wildlife Service concerning any information they may have on whether any listed or proposed to be listed endangered or threatened species may be present in the area which would be affected by the activity, pursuant to Section 7(c) of the Endangered Species Act of 1972 (as amended). No DA permit will be issued until the Corps has verified that all obligations under Section 7 of the Endangered Species Act have been fulfilled.
PUBLIC INTEREST REVIEW AND CUMULATIVE EFFECTS: This application will be reviewed in accordance with 33 CFR 320 332, the Regulatory Program of the Corps, and other pertinent laws, regulations, and executive orders. Our evaluation will also follow guidelines published by the U.S. Environmental Protection Agency pursuant to Section 404(b)(1) of the Clean Water Act (40 CFR 230). The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits that reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors that may be relevant to the proposal will be considered including the cumulative effects thereof; of those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people.
SOLICITATION OF COMMENTS: The Corps is soliciting comments from the public, federal, state, and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. For accuracy and completeness of the administrative record, all data in support of or in opposition to the proposed work should be submitted in writing setting forth sufficient detail to furnish a clear understanding of the reasons for support or opposition. Any person may request, in writing, within the comment period specified in the notice, that a public hearing be held to consider the application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Written statements on these factors received in this office on or before the expiration date of this Public Notice will become a part of the record and will be considered in the final determination. A permit will be granted unless its issuance is found to be contrary to the public interest.
CLOSE OF COMMENT PERIOD: Comments and should be submitted electronically to Kimberly Courts-Brown by email at Kimberly.d.courtsbrown@usace.army.mil. If you do not have internet access, comments may be submitted through the U.S. Postal Service (USPS) to the following address:
U. S. Army Corps of Engineers
ATTN: CELRH-RD-E Public Notice: LRH-2020-631-BCR
502 Eighth Street
Huntington, West Virginia 25701-2070
Copies should only be provided through the USPS when electronic submission is not possible. Precautionary internal mail handling procedures may be instituted to protect our workforce, which may result in longer than normal times to process and receive hard copy submissions. To be considered in our evaluation, comments submitted through the USPS should have a postmark date on, or prior to, the close of the comment period listed on page one (1) of this Public Notice. Please note, the names and addresses of those who submit comments in response to this Public Notice become part of our administrative record and, as such, may be available to the pubic under provisions of the Freedom of Information Act. If you have any questions concerning this Public Notice, please contact Kimberly Courts-Brown of the Energy Resource Branch at (304) 399-6906.
Table 1 – Proposed Discharges of Dredged and/or Fill Material
Turkeyfoot Surface Mine (S-3014-19)
LRH-2020-631-BCR
Mining Activity
Name of Water of U.S.
Flow Regime
Length/Acreage
Volume of Discharge
Duration of Impact
Valley Fill No. 1
UNT McGraws Fork (MC-A)
Intermittent
657 lf
0.09 acre
90.3 cy
Permanent
Valley Fill No.1
UNT McGraws Fork (MC-B)
Intermittent
667 lf
0.09 acre
49.4 cy
Permanent
Valley Fill No. 1
UNT McGraws Fork (MC-C)
Intermittent
467 lf
0.03 acre
21.6 cy
Permanent
Valley Fill No. 1
McGraws Fork
(MC-D)
Intermittent
1,618 lf
0.38 acre
300 cy
Permanent
Valley Fill No. 1
UNT McGraws Fork
(MC-E)
Intermittent
300 lf
0.02 acre
32.1 cy
Permanent
Valley Fill No. 1
UNT McGraws Fork (MC-F)
Intermittent
100 lf
0.005 acre
5.9 cy
Permanent
Sediment Pond No. 1B
UNT Workman Branch (below existing NPDES Outlet 002)
Intermittent
209 lf
0.04 acre
61.3 cy
Temporary
Permanent Impacts
Temporary Impacts
3,809 lf (0.62 acre)
209 lf (0.04)
499 cy
61.3 cy
Valley Fill No. 2
UNT Stover Fork (SFR6L1R1R)
Intermittent
240 lf
0.23 acre
71.1 cy
Permanent
Valley Fill No. 2
UNT Stover Fork
(SF8R6L1R)
Intermittent
1,072 lf
0.11 acre
254 cy
Permanent
Valley Fill No. 2
Stover Fork
(SF8R6L)
Intermittent
328 lf
0.003 acre
164 cy
Permanent
Sediment Pond No. 2
UNT Stover Fork
(SF8R5L)
Intermittent
103 lf
0.02 acre
8.0 cy
Temporary
Sediment Pond No. 2
Stover Fork
(SF8R6L)
Intermittent
272 lf
0.03 acre
151.1 cy
Temporary
Sediment Pond No. 2
UNT Stover Fork
(SF8R)
Intermittent
470 lf
0.097 acre
297 cy
Temporary
Sediment Pond No. 2
WL-SF3
PEM
0.27 acres
400 cy
Temporary
IUAR #2
UNT Stover Fork
(SF8R3L)
Intermittent
119 lf
0.015 acre
44.4 cy
2-36” culverts
Temporary
Permanent Impacts
Temporary Impacts
1,640 lf (0.34 acre)
964 lf (0.16 acre)
0.27 acre wetland
489 cy
901 cy
Valley Fill No. 3
Right Fork Workman Creek
(WC-1)
Perennial
3,660 lf
0.38 acre
371 cy
Permanent
Valley Fill No. 3
UNT Right Fork Workman Creek
(WC-1.1)
Intermittent
322 lf
0.03 acre
34.2 cy
Permanent
Valley Fill No. 3
UNT Right Fork Workman Creek
(WC-1.5)
Intermittent
423 lf
0.01 acre
0.78 cy
Permanent
Valley Fill No. 3
UNT Right Fork Workman Creek
(WC-1.4)
Intermittent
235 lf
0.01 acre
6.39 cy
Permanent
Valley Fill No. 3
UNT Right Fork Workman Creek
(WC-1.2)
Intermittent
560 lf
0.05 acre
51 cy
Permanent
Sediment Pond No. 3
Wetland 1
PEM
1.52 acres
Removal by excavation[STDCUC(1]
Permanent
Sediment Pond No. 3
Right Fork Workman Creek
(WC-1)
Perennial
605 lf
0.06 acre
38.6 cy
Temporary
Sediment Pond No. 3
UNT Right Fork Workman Creek
(WC-2)
Intermittent
360 lf
0.03 acre
18.47 cy
Temporary
IUAR #3
UNT Right Fork Workman Creek
(WC-3)
Intermittent
70 lf
0.003 acre
1.79 cy
1-36” CMP
Temporary
IUAR #3
(crossing 2)
UNT Right Fork Workman Creek
(WC-4)
Intermittent
70 lf
0.004 acre
3.11 cy
1-36” CMP
Temporary
Permanent Impacts
Temporary Impacts
5,200 lf (0.75 acre)
1.52 acres wetland
1,105 lf (0.10 acre)
463 cy
44 cy
62 cy
Valley Fill No. 4
Wingrove Branch
(WC-1)
Intermittent
1,680 lf
0.06 acre
29.87 cy
Permanent
Valley Fill No. 4
UNT Wingrove Branch
(W-3.1)
Intermittent
605 lf
0.017 acre
8.4 cy
Permanent
Valley Fill No. 4
UNT Wingrove Branch
(W-4)
Intermittent
887 lf
0.06 acre
13.18 cy
Permanent
Valley Fill No. 4
UNT Wingrove Branch
(W-5)
Intermittent
400 lf
0.037 acre
2.96 cy
Permanent
Valley Fill No.4
UNT Wingrove Branch
(W-5.1)
Intermittent
225 lf
0.013 acre
8.5 cy
Permanent
Sediment Pond No. 4
UNT Wingrove Branch
(W-6)
Intermittent
185 lf
0.01 acre
4.79 cy
Temporary
Sediment Pond No. 4
UNT Wingrove Branch
(W-7)
Intermittent
237 lf
0.007 acre
6.58 cy
Temporary
Sediment Pond No. 4
UNT Wingrove Branch
(W-3)
Intermittent
894 lf
0.053 acre
20.4 cy
Temporary
IUAR #4
UNT Wingrove Branch
(W-3)
Intermittent
240 lf
0.039 acre
43.56 cy
9-48” CMP
Temporary
2 Drive-through
Crossings
Wingrove Branch
(WC-1)
Perennial
140 lf
0.03 acre
96.8 cy
Temporary
Permanent Impacts
Temporary Impacts
3,797 lf (0.19 acre)
1,696 lf (0.14 acre)
63 cy
172 cy
Total Permanent Perennial Discharges
Total Permanent Intermittent Discharges
Total Permanent Wetland Discharges[STDCUC(2]
3,660 lf
(0.38 acre)
10,786 lf
(1.52 acres)
1.52 acres wetland
371 cy
1,514 cy
Total Temporary Perennial Discharges
Total Temporary Intermittent Discharges
Total Temporary Wetland Discharges[STDCUC(3]
140 lf
(0.03 acre)
3,834 lf
(0.38 acre)
0.27 acre wetland
367 cy
418 cy
Total Discharges of Dredged and/or Fill Material into Waters of the U.S.
18,420 lf
(2.31 acres)
1.79 acres wetland
2,670 cy
Table 2 –
Turkeyfoot Surface Mine (S-3014-19)
LRH-2020-631-BCR
Overall Mitigation Proposal
Mitigation Type
Stream Length and Wetland Acreage
WV SWVM 2.1 Credits
McGraws Hollow Watershed On-Site Re-Establishment
209 lf
49.11
Workman Creek Watershed
On-Site Re-Establishment
1,855 lf
1,459.53
Stover Fork Watershed On-Site Re-Establishment
1,411 lf
1,002.00
Wingrove Branch On-Site Re-Establishment
1,696 lf
1,267.64
Workman Creek (WC-1) On-Site Establishment
2,835 lf
2,027.80
TOTAL
On-Site Stream Re-Establishment & Establishment
8,006 lf
5,806.08
McGraw East Off-Site Establishment/Restoration/Preservation
7,935 lf
5,096.87
McGraw West Off-Site Establishment and Restoration
3,950 lf
2381.40
Stover Fork (SF2R) Watershed Off-Site Stream Establishment and Restoration
6,742 lf
4,291.99
Stover Fork Watershed Off-Site Wetland Establishment
4.1 acres
TOTAL
Off-Site Establishment/Restoration/Preservation
18,627 lf
11,770.26
TOTAL MITIGATION
26,633 lf
17,576.34 credits
Table 3 –
Turkeyfoot Surface Mine (S-3014-19)
LRH-2020-631-BCR
Overall Mitigation Proposal
Overall Discharges
Mitigation Sites
Re-established
Restored
Established
Preservation
Linear Feet (streams)
18,420 lf
5,171 lf
11,933 lf
9,199 lf
330 lf
Acres (wetlands)
1.79 acres
--
--
4.1 acres
--
RBP-HAV
93.7
94
133
117
144
WVSCI
70.9
66
75
73
--
HGM Index
0.77
--
0.85
0.89
0.93
SWVM Index
0.68
0.59
0.82
0.75
0.89
Total Stream Mitigation
26,633 lf of intermittent and perennial streams
4.1 acres of PEM wetland
Table 4 – Proposed On-Site Compensatory Mitigation
Turkeyfoot Surface Mine (S-3014-19)
LRH-2020-631-BCR
Mitigation Site
Stream Length
Predicted Flow Regime
Riparian Buffer Width
Mitigation Type
Workman Creek at Pond No. 1B
209 lf
Intermittent
100 lf - 50 lf top of each bank
Post-Project On-site Stream Re-establishment
UNT Stover Fork (SF8R5L)
Pond No. 2
550 lf
Intermittent
Post-Project On-Site Stream Re-establishment
UNT Stover Fork (SF8R)
Pond No. 2
272 lf
Intermittent
Post Project On-Site Stream Re-Establishment
WL-SF3
Pond No. 2
See off-site wetland mitigation proposal
--
--
UNT Stover Fork
(SF8R3L)
IUAR#2 Road Crossing
119 lf
Perennial
100 lf - 50 lf top of each bank
Post Project On-Site Stream Re-Establishment
Right Fork Workman Creek (WC-1)
Pond No. 3
955 lf
Intermittent
Post-Project On-Site Stream Re-Establishment
Right Fork Workman Creek
(WC-1.1)
Pond No. 3
400 lf
Intermittent
Post-Project On-Site Stream Establishment
UNT Right Fork Workman Creek (WC-2)
Pond No. 3
360 lf
Intermittent
Post-Project On-Site Stream Re-Establishment
Wetland 1
Pond No. 2
See off-site wetland mitigation proposal
--
--
UNT Right Fork Workman Creek
(WC-3&4)
IUAR #3
140 lf
Intermittent
Post-Project On-Site Stream Re-establishment
Right Fork Workman Creek
(WC-1)
2,835 lf
Perennial
Post-Project On-Site Stream Establishment
UNT Wingrove Branch (W-7)
Pond No. 4
237 lf
Intermittent
Post-Project On-Site Stream Re-establishment
UNT Wingrove Branch (W-3)_
Pond No. 4
894 lf
Intermittent
Post-Project On-Site Stream Re-Establishment
UNT Wingrove Branch (W-6)
Pond No. 4
185 lf
Intermittent
Post-Project On-Site Stream Re-establishment
UNT Wingrove Branch (W-3)
IUAR #4
240 lf
Intermittent
Post-Project On-Site Stream Re-establishment
Wingrove Branch
(WC-1)
2 drive-through crossings
140 lf
Perennial
Post-Project On-Site Stream Re-establishment
Total Proposed On-Site Stream Mitigation
3,235 lf of stream establishment
4,771 lf of stream re-establishment
TOTAL
8,006 lf of on-site mitigation stream channels
18.4 acres of forested riparian buffer
Table 5 – Proposed Off -Site Compensatory Mitigation
Turkeyfoot Surface Mine (S-3014-19)
LRH-2020-631-BCR
Mitigation Site
Stream Length
Predicted Flow Regime
Riparian Buffer Width
Mitigation Type
McGraws East Mitigation Area
UNT Workman Creek (WH-1)
876 lf
Intermittent
100 lf - 50 lf top of each bank
Off-Site Stream Establishment
UNT Workman Creek (WH1-1)WWhStover
1250 lf
Intermittent
Off-Site Stream Restoration
UNT Workman Creek (WH1-1)
330 lf
Intermittent
Off-Site Preservation
UNT Workman Creek (McGraw East 1)
1532 lf
Intermittent
Off-Site Stream Establishment
UNT Workman Creek (McGraw East 2)
1164 lf
Intermittent
Off-Site Stream Restoration
UNT Workman Creek (MC-K)
595 lf
Intermittent
Off-Site Stream Restoration
UNT Workman Creek (MC-L)
123 lf
Intermittent
Off-Site Stream Restoration
UNT Workman Creek (MC-J)
650 lf
Intermittent
Off-Site Stream Restoration
UNT Workman Creek (MC-I)
500 lf
Intermittent
Off-Site Stream Restoration
UNT Workman Creek
(McGraw East 3)
915 lf
Intermittent
Off-Site Stream Establishment
McGraw’s West Mitigation Area
McGraw’s Fork
(McGraw West 1)
1959 lf
Intermittent
Off-Site Stream Establishment
UNT McGraw’s Fork (McGraw West 2)
1050 lf
Intermittent
Off-Site Stream Establishment
UNT McGraw’s Fork (MC-G)
595 lf
Intermittent
Off-Site Stream Restoration
UNT McGraw’s Fork (MC-H)
345 lf
Intermittent
Off-Site Stream Restoration
Stover Fork SF2R Mitigation Area
UNT Stover Fork (SF2R-Lower)
1296 lf
Intermittent
Off-Site Stream Restoration
UNT Stover Fork (SF2R-Upper)
1650 lf
Intermittent
Off-Site Stream Restoration
UNT Stover Fork
(SF2R-A)
780 lf
Intermittent
Off-Site Stream Restoration
UNT Stover Fork (SF2R-A)
150 lf
Intermittent
Off-Site Stream Establishment
UNT Stover Fork
(SF2R-B)
540 lf
Intermittent
Off-Site Stream Restoration
UNT Stover Fork
(SF2R-B)
141 lf
Intermittent
Off-Site Stream Establishment
UNT Stover Fork
(SF2R-C)
315 lf
Intermittent
Off-Site Stream Restoration
UNT Stover Fork
(SF2R-C)
275 lf
Intermittent
Off-Site Stream Establishment
UNT Stover Fork
(SF2R-D)
489 lf
Intermittent
Off-Site Stream Restoration
UNT Stover Fork
(SF2R-D)
142 lf
Intermittent
Off-Site Stream Establishment
UNT Stover Fork
(SF2R-3R)
440 lf
Intermittent
Off-site Stream Restoration
UNT Stover For
(SF2R-4R)
325 lf
Intermittent
Off-Site Stream Restoration
UNT Stover Fork
(SR2R-4R)
200 lf
Intermittent
Off-Site Stream
Establishment
Stover Creek Wetlands
4.1 acres
PEM
Off-Site Wetland Establishment
Total Proposed Off-Site Stream Mitigation
7,240 lf of stream establishment
11,933 lf of stream restoration
330 lf of stream preservation
4.1 acres of wetland creation
TOTAL
19,503 lf of stream channels
44.8 acres of forested riparian buffer
4.1 acres of PEM wetland