You can copy from here when filling out the rest of the page.
The Los Angeles Department of Water and Power is proposing to completely fill in 2,150 linear feet of the Haynes Intake Channel within Haynes using engineered fill.
The Los Angeles Department of Water and Power is proposing to completely fill in 2,150 linear feet of the Haynes Intake Channel within Haynes using engineered fill. The infill area is expected to be used for potential future development at Haynes. The proposed project would occur over two phases: Phase I would consist of filling the northern 475 feet of the Haynes Intake Channel, and Phase II would consist of filling the remainder of the channel to approximately 2 feet south of the 2nd Street bridge, for a total of approximately 2,150 feet. The duration of Phase I construction activities would be approximately 15 months, with proposed construction scheduled to begin in late 2021 and end in 2023. The duration of Phase II construction activities would be approximately 30 months, beginning in 2030 and ending in 2032. This proposal is for a 10-year Standard Individual Permit.