You can copy from here when filling out the rest of the page.
PIPELINE ABANDONMENT IN GULF OF MEXICO OFF TERREBONNE PARISH
NAME OF APPLICANT: Shell Pipeline Company, LP, Post Office Box 2648, Houston, Texas 77252.
LOCATION OF WORK: Located off Terrebonne Parish, Louisiana, in the Gulf of Mexico, 27.977175, -90.59525, as shown within the attached drawings.
CHARACTER OF WORK: Partial abandonment in-place of an existing 14-inch Gensis Oil Pipeline from GC205 to a SSTI in EW 952 due to decommissioning of Chevron’s GC205 A Platform. The pipeline passes through the Gulf Safety Fairway in EW997 and EW953. There will be no activities performed withing the Gulf Safety Fairway in association with this partial abandonment. The proposed project does not include discharge of fill material or include wetland impacts or effects to special aquatic sites. The applicant has not proposed to provide compensatory mitigation, as there are no plans to impacts wetlands resources through project construction.