Home

Nashville District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Navigation Notice 21-20: A series of lock closures for hydraulic steel structure inspections are scheduled for navigation locks on the Tennessee River.

Navigation Notice 21-20: A series of lock closures for hydraulic steel structure inspections are scheduled for navigation locks on the Tennessee River. Inspections are set June 7-10, 2021, for Pickwick Lock and Wheeler Lock; June 14-17, 2021, for Guntersville Lock and Nickajack Lock; and June 28 to July 1, 2021, for Wilson Lock. Each closure will last from 6 a.m. to 4:30 p.m. each day. Call Mike Murphy at 423-870-7674 for more information.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas