STATE : OHIO APPLICANT: PINCHAL & COMPANY LLC PROJECT PURPOSE: The applicant has requested authorization to discharge dredged and/or fill material into 2

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

STATE : OHIO

APPLICANT: PINCHAL & COMPANY LLC

PROJECT PURPOSE: The applicant has requested authorization to discharge dredged and/or fill material into 2,219 linear feet (0.30 acre) of the perennial stream known as Stimmel Ditch in conjunction with the proposed Talbott Property Development Project, Western Portion.

TO WHOM IT MAY CONCERN: The following application has been submitted for a Department of the Army (DA) Permit under the provisions of Section 404 of the Clean Water Act.

APPLICANT: Mr. Brian McMackin

Pinchal & Company, LLC

4400 Post Oak Parkway, Suite 2350

Houston, Texas 77027

LOCATION: As depicted on the attached Sheet 1 of 4, the proposed project would be located within the watershed of the Scioto River on an approximately 42-acre site south of London-Groveport Road in the City of Columbus, Franklin County, Ohio (Latitude 39.829557, Longitude -82.963192). The waters on-site include a perennial stream known as Stimmel Ditch, an indirect tributary to the Scioto River, a navigable water of the United States.

DESCRIPTION OF PROPOSED WORK: The applicant has requested a DA authorization to discharge dredged and/or fill material into 2,219 linear feet (0.30 acre) of the perennial stream known as Stimmel Ditch (reference attached Table 1) in conjunction with the proposed Talbott Property Development Project, Western Portion. The overall development would include the construction of a warehouse distribution facility and its attendant features. Plans for the proposed project are attached to this notice (Sheet 2 of 4). The applicant proposes to relocate 2,219 linear feet of stream (Stimmel Ditch) and associated stream corridor buffer to a location along the north and west boundaries of the proposed project area (Sheets 3-4 of 4).

ALTERNATIVES ANALYSIS: As a result of the proposal, fill material would be discharged into waters of the United States as described above and in the attached Table 1. The project does not require access or proximity to or siting within special aquatic sites to fulfill its basic purpose and is considered a non-water dependent activity. The Section 404(b)(1) Guidelines state for non-water dependent activities, practicable alternatives are presumed to be available, unless clearly demonstrated otherwise. The applicant is required to provide an alternatives analysis that must overcome this presumption prior to receiving authorization for the discharge of dredged and/or fill material. No permit will be issued until our review of the alternative analysis clearly demonstrates that practicable upland alternatives are not available to achieve the overall project purpose.

AVOIDANCE AND MINIMIZATION: In evaluating a project area containing waters of the United States, consideration must be given to avoiding impacts on these sites. If waters of the United States cannot be avoided, then the impacts must be minimized. A total of 2,655 linear feet (0.36 acre) of one (1) perennial stream, Stimmel Ditch, is located within the proposed project area. The applicant has indicated they have avoided and minimized impacts to waters of the United States to the maximum extent practicable. Stormwater management planning would incorporate best management practices and water pollution controls necessary to maintain compliance with the Federal Water Pollution Control Act and Ohio Water Pollution Control Act. Stormwater management and erosion control systems would be implemented during construction. All disturbed areas would be seeded and/or revegetated with native plant species and native seed mixes after completion of construction activities.

COMPENSATORY MITIGATION PLAN (CMP): To compensate for the loss of waters of the United States associated with the proposed project, the applicant proposes to re-establish on-site a total of 2,940 linear feet of Stimmel Ditch using natural channel design techniques. The applicant’s CMP is currently under review. After review of all the submitted information, the Corps will make a determination of the appropriate compensatory mitigation in the event a decision is made to issue a DA authorization.

WATER QUALITY CERTIFICATION: The applicant must obtain a Section 401 Water Quality Certification (WQC) from the Ohio Environmental Protection Agency assuring that applicable laws and regulations pertaining to water quality are not violated. A DA permit, if otherwise warranted, would not be issued on this project until the Section 401 WQC has been issued or waived.

HISTORIC AND CULTURAL RESOURCES: The Corps is required by the National Historic Preservation Act (NHPA) to ensure no federal undertaking, including a Corps permit action, which may affect historic resources, is commenced before the impacts of such action are considered and the Advisory Council on Historic Preservation and the State Historic Preservation Office (SHPO) are provided an opportunity to comment as required by the NHPA, 36 CFR 800, and 33 CFR 325, Appendix C. A Phase I Cultural Resource Management Survey for a 34.4 ha (85 acre) Development Site in Hamilton Township, Franklin County, Ohio dated December 29, 2006 was completed by Weller & Associates. The Phase I survey encompasses the entire 42-acre subject site. The Phase I survey resulted in the identification of six (6) prehistoric archaeological sites and one (1) historic period site. By letter dated September 20, 2007, the Ohio SHPO determined the aforementioned sites do not meet the National Register of Historic Places (NRHP) criteria for eligibility. The Corps has determined the proposed project would have no effect on historic properties eligible or potentially eligible for inclusion on the NRHP. A copy of this public notice will be furnished to the Ohio SHPO for their review. Comments concerning archaeological sensitivity of the project area should be based on collected data. No DA permit will be issued until all obligations under Section 106 of the NHPA of 1966 have been fulfilled.

THREATENED AND ENDANGERED SPECIES: The proposed project is located within the known or historic range of the endangered Indiana bat (Myotis sodalis), the threatened northern long-eared bat (Myotis septentrionalis), the endangered Scioto madtom (Noturus trautmani), the endangered clubshell mussel (Pleurobema clava), the endangered northern riffleshell mussel (Epioblasma torulosa rangiana), the endangered rayed bean mussel (Villosa fabalis), the endangered snuffbox mussel (Epioblasma triquetra), and the threatened rabbitsfoot mussel (Quadrula cylindrical cylindrical). The proposed project area is comprised primarily of agricultural fields and 2,655 linear feet of Stimmel Ditch with a forested and shrub stream corridor. The proposed project area could provide potential habitat for the Indiana bat and the northern long-eared bat. The applicant has agreed to conduct tree clearing operations associated with the proposed project prior to April 1 and after September 30, as recommended by the United States Fish and Wildlife Service (USFWS), to minimize effects on the Indiana bat and the northern long-eared bat. The Corps has determined the proposed project may affect, but is not likely adversely affect the Indiana bat or the northern long-eared bat. The Corps has consulted the most recently available information and information provided by the applicant and has determined the proposed project area does not provide suitable habitat for the Scioto madtom, the clubshell mussel, the northern riffleshell mussel, the rayed bean mussel, the snuffbox mussel, and the rabbitsfoot mussel. The Corps has determined the proposed project would have no effect on the Scioto madtom, the clubshell mussel, the northern riffleshell mussel, the rayed bean mussel, the snuffbox mussel, and the rabbitsfoot mussel. This Public Notice serves as a request for concurrence from the USFWS for the aforementioned effect determinations and for any additional information they may have on whether any listed or proposed to be listed endangered or threatened species may be present in the area which would be affected by the activity, pursuant to Section 7(c) of the Endangered Species Act (ESA) of 1972 (as amended). No DA permit will be issued until the Corps has verified that all obligations under Section 7 of the ESA have been fulfilled.

PUBLIC INTEREST REVIEW AND CUMULATIVE EFFECTS: This application will be reviewed in accordance with 33 CFR 320‑332, the Regulatory Program of the Corps, and other pertinent laws, regulations, and executive orders. Our evaluation will also follow the guidelines published by the United States Environmental Protection Agency pursuant to Section 404(b)(1) of the Clean Water Act (40 CFR 230). The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the proposed activity on the public interest. That decision will reflect the national concern for both the protection and the utilization of important resources. The benefit that reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors that may be relevant to the proposal will be considered, including the cumulative effects thereof; among those factors are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people.

SOLICITATION OF COMMENTS: The Corps is soliciting comments from the public, Federal, state and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. For accuracy and completeness of the administrative record, all data in support of or in opposition to the proposed work should be submitted in writing setting forth sufficient detail to furnish a clear understanding of the reasons for support or opposition. Any person may request, in writing, within the comment period specified in the notice, that a public hearing be held to consider the application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Written statements received in this office on or before the expiration date of this Public Notice will become a part of the record and will be considered in the final determination. A permit will be granted unless its issuance is found to be contrary to the public interest.

CLOSE OF COMMENT PERIOD: All comments pertaining to this Public Notice must reach this office on or before the close of the comment period listed on page one (1) of this Public Notice. If no comments are received by that date, it will be considered that there are no objections. Comments should be submitted electronically to Ms. Kayla Osborne by email at kayla.n.osborne@usace.army.mil. If you do not have internet access, comments may be submitted through the U.S. Postal Service (USPS) to the following address:

United States Army Corps of Engineers, Huntington District

ATTN: CELRH-RD-N Public Notice: LRH-2017-475-SCR

502 Eighth Street

Huntington, West Virginia 25701-2070

Copies should only be provided through the USPS when electronic transmission is not possible. Precautionary internal mail handling procedures may be instituted to protect our workforce, which may result in longer than normal times to process and receive hard copy submissions. To be considered in our evaluation, comments submitted through the USPS should have a postmark dated on, or prior to, the close of the comment period listed on page one (1) of this Public Notice.

Please note names, addresses, and comments submitted in response to this Public Notice become part of our administrative record and, as such, may be available to the public under provisions of the Freedom of Information Act. Thank you for your interest in our nation’s aquatic resources. If you have any questions concerning this Public Notice, please contact Ms. Kayla Osborne of the North Branch, at 304-399-5850, by mail at the above address, or by email at kayla.n.osborne@usace.army.mil.

Table 1. Proposed discharges of dredged and/or fill material into Waters of the United States associated with the Talbott Property Development Project, Western Portion, in the City of Columbus, Franklin County, Ohio (Latitude 39.829557, Longitude -82.963192) – LRH-2017-475-SCR-Stimmel Ditch.

Aquatic Resource

Latitude & Longitude

(°N) (°W)

Flow Regime or Cowardin Class

Estimated amount of aquatic resource in review area

Linear Feet (lf) and/or Acres (ac) of Fill

Stimmel Ditch

39.82974

-82.96266

Perennial Stream

2,655 linear feet

(0.36 acre)

2,219 linear feet

(0.30 acre)

Total

2,219 linear feet

(0.30 acre)

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas