You can copy from here when filling out the rest of the page.
EROSION REPAIRS TO EFFLUENT PIPELINE FROM HURRICANE DELTA DAMAGE IN DEVIL’S SWAMP LAKE WITHIN EAST BATON ROUGE PARISH
NAME OF APPLICANT: CLEAN HARBORS ENVIRONMENTAL SERVICES, INC. c/o GHD Inc., 5551 Corporate Blvd #200, Baton Rouge Louisiana 70808.
LOCATION OF WORK: In Devil’s Swamp Lake, Section 47, T5S-R1W, located adjacent to the Clean Harbors Facility, Latitude 30.562436, Longitude -91.223551, in East Baton Rouge Parish, within the Mississippi River Basin in hydrologic unit (HUC 08070201), as shown on the attached drawings.
CHARACTER OF WORK: The applicant has requested a Department of the Army authorization to replace soil and place riprap fill for erosion repairs due to Hurricane Delta to 120 linear feet of a 16-inch water discharge pipeline. An emergency authorization (General Permit – 20) was granted for the replacement of fill, rip-rap armoring, and repairs to portions of erosion areas 1 and 2 and the work has been completed. The applicant is proposing culverts and fill to be placed in erosion area 2 and a new erosion area 3 to further stabilize the effluent line. The applicant proposes to access the erosion areas with the temporary placement of timber mats.