The work involves the replacement and rehabilitation

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The work involves the replacement and rehabilitation, respectively, of the Greater Utility

The work involves the replacement and rehabilitation, respectively, of the Greater Utility District’s existing 8” and 20” parallel cast iron sanitary sewer siphons (pipelines) and the installation of a new 16” water main and a new 16” sewer siphon beyond the mean high water line and buried below the bottom of the Kennebec River at Augusta, Maine. The pipeline installations will be facilitated by the construction of a temporary 25’ wide x 70’ long pile supported construction trestle (work platform) extending beyond the mean high water line from the west bank of the river, and the installation of up to eight (8) individual temporary piles spanning the river. All temporary structures are to be removed one the construction is complete.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas