Home

Tulsa District

Run scraper

This Special Public Notice announces the start of the Field Trial Period for the OSMM. The OSMM will typically be applied on those permit evaluations where a pre-construction notification is required to be submitted to the Corps. The OSMM is authorized for use by the Corps

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

This Special Public Notice announces the start of the Field Trial Period for the OSMM. The OSMM will typically be applied on those permit evaluations where a pre-construction notification is required to be submitted to the Corps. The OSMM is authorized for use by the Corps, applicants, and authorized agents to determine the amount of compensatory mitigation necessary to offset unavoidable stream impacts associated with Department of the Army permit evaluations (see 33 CFR 332.3(f)). All users will also have the ability to provide substantiated comment concerning this OSMM during the Field Trial Period.

The OSMM tool and worksheets can be downloaded from following web link: https://www.swt.usace.army.mil/Missions/Regulatory/Mitigation/.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas