Home

St. Louis District

Run scraper

Cave City Sand requests Section 10 Rivers and Harbors Act permit authorization to operate two barge fleets and an associated river terminal near the right descending bank of the Mississippi River

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Cave City Sand requests Section 10 Rivers and Harbors Act permit authorization to operate two barge fleets and an associated river terminal near the right descending bank of the Mississippi River, between approximate river miles 137.3 to 136.8, in Sections 14, Township 39 North, Range 7 East, in Ste. Genevieve County, Missouri. The Public Notice comment period is open from August 11, 2021 through August 29, 2021.

Cave City Sand requests Section 10 Rivers and Harbors Act permit authorization to operate two barge fleets and an associated river terminal near the right descending bank of the Mississippi River, between approximate river miles 137.3 to 136.8, in Sections 14, Township 39 North, Range 7 East, in Ste. Genevieve County, Missouri. The Public Notice comment period is open from August 11, 2021 through August 29, 2021.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas