Home

Philadelphia District

Run scraper

The USACE Philadelphia District has received a Prospectus to establish a compensatory wetland mitigation bank for Department of the Army permits. The proposed Tohickon Creek Mitigation Bank site is located within the Upper Tohickon Creek Watershed

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The USACE Philadelphia District has received a Prospectus to establish a compensatory wetland mitigation bank for Department of the Army permits. The proposed Tohickon Creek Mitigation Bank site is located within the Upper Tohickon Creek Watershed, one of three smaller drainage areas that comprise the Tohickon Creek Watershed and has recently been principally used for agricultural production of hay and cultivated crops. The Bank Sponsor intends to establish the bank to provide compensatory mitigation to compensate for unavoidable impacts to Waters of the United States and/or Waters of the Commonwealth, including wetlands, occurring in the Lower Delaware River Subbasin (Pennsylvania State Water Plan Sub-basin #3S). Public comments are requested by September 22, 2021. More details are available in the "Public Notice & Plan Details" attachment.

The USACE Philadelphia District has received a Prospectus to establish a compensatory wetland mitigation bank for Department of the Army permits. The proposed Tohickon Creek Mitigation Bank site is located within theUpper Tohickon Creek Watershed, one of three smaller drainage areas that comprise the Tohickon Creek Watershed and has recently been principally used for agricultural production of hay and cultivated crops. The Bank Sponsor intends to establish the bank to provide compensatory mitigation to compensate for unavoidable impacts to Waters of the United States and/or Waters of the Commonwealth, including wetlands, occurring in the Lower Delaware River Subbasin (Pennsylvania State Water Plan Sub-basin #3S). Public comments are requested by September 22, 2021. More details are available in the "Public Notice & Plan Details."

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas