In compliance with U.S.C. Title 33, Chapter 9, Subchapter 1, Section 408, the City of Wichita, Kansas and Kansas Department of Transportation (KDOT) (requester) has requested permission from the U.S. Army Corps of Engineers (USACE) for the installation of culverts; removal of flap gates; highway embankment tie-in to the levee, and compensatory drainage for highway embankment drainage in the vicinity of WVC Chisholm Levee D and Levee P.

A new highway bridge crossing over WVC Chisholm Levee D, compacted fill within the retention basin connected to Middle Fork Chisholm Creek. The bridge abutment will tie into Levee D with overbuilt embankment materials. The current elevation of WVC Big Slough Levee D is 1,337.30 feet and the proposed highway embankment crossing elevation is 1,340.1 feet. The bridge will be founded on steel piles which will be driven to bearing capacity on the riverside WVC Big Slough Levee D embankment just outside of the 15-foot vegetation and encroachment free zone and will be constructed utilizing standard engineering practices.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas