PROPOSED GATE INSTALLATION, SHIP SHOAL CRUDE-SEGMENT 1 BAYOU GOREAU, TERREBONNE PARISH
NAME OF APPLICANT: SHELL PIPELINE COMPANY, LP, c/o T. Baker Smith, LLC, Attn: Michael Trahan, Post Office Box 2255, Houma, Louisiana 70361.
LOCATION OF WORK: Canal off Bayou Goreau, located in Section 35, Township 21 South, Range 13 East, south of Morgan City, Louisiana, (29.200469, -91.090544), in Terrebonne Parish, as shown on the enclosed drawings, within Hydrologic Unit Code 08090302, West Central Louisiana Coastal.
CHARACTER OF WORK: The applicant has requested Department of the Army authorization to remove previously permitted eco bales and to install and maintain two (2) gated fences, all to protect the 22-inch diameter Ship Shoal Crude-Segment 1 Pipeline. No dredging or fill is required. Approximately 0.001 ac of Other Waters of the US will be temporarily impacted as a result of piling installation activities. All work will take place from the existing waterway. The proposed work does not include any dredge or fill activities and is not expected to have any impacts to jurisdictional wetlands.