The applicant seeks authorization to conduct grading and filling operations in waters of the United States for the expansion of existing quarry operations. The project is to occur at the existing Bedrock Quarry near Troy

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant seeks authorization to conduct grading and filling operations in waters of the United States for the expansion of existing quarry operations. The project is to occur at the existing Bedrock Quarry near Troy, Missouri. The project proposes to impact 1,400 linear feet of Sand Run Creek by excavating it to expand the quarry to the north. Plans include permanently relocating the stream to the north of its current configuration, which would result in the construction of 1,410 linear feet of channel. The relocated channel will have a bottom substrate of natural occurring silt and cobble which mimics the existing conditions. The entire relocated section of channel will have rock longitudinal stone toe. Written comments must be submitted by replying by electronic mail or written mail to the address in the notice.

The Public Notice comment period opens September 9, 2021 and closes September 29, 2021.

The applicant seeks authorization to conduct grading and filling operations in waters of the United States for the expansion of existing quarry operations. The project is to occur at the existing Bedrock Quarry near Troy, Missouri. The project proposes to impact 1,400 linear feet of Sand Run Creek by excavating it to expand the quarry to the north. Plans include permanently relocating the stream to the north of its current configuration, which would result in the construction of 1,410 linear feet of channel. The relocated channel will have a bottom substrate of natural occurring silt and cobble which mimics the existing conditions. The entire relocated section of channel will have rock longitudinal stone toe. Written comments must be submitted by replying by electronic mail or written mail to the address in the notice.

The Public Notice comment period opens September 9, 2021 and closes September 29, 2021.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas