Please Address all Comments to: U.S. Army Corps of Engineers, East Permits Branch Attn: Gary L. Davis 3701 Bell Road, Nashville, TN 37214

PUBLIC NOTICE US ARMY CORPS OF ENGINEERS

SUBJECT: Proposed Discharge of Fill Material for Commercial Development, AdjacentWetland to Unnamed Tributary of Mine Creek, Cumberland River Mile 309.0L, Baxter, Putnam County, Tennessee

TO ALL CONCERNED: The work described below has been submitted for aDepartment of the Army Permit (DA) pursuant to Section 404 of the Clean Water Act (CWA). Before a permit can be issued, certification must be provided by the TennesseeDepartment of Environment and Conservation (TDEC) Division of Water Resources pursuant to Section 401(1)(1) of the CWA, that applicable state water quality standardswill not be violated by the work.

APPLICANT: Portobello America, Inc. 650 South Jefferson Avenue, Suite 115 Cookeville, TN 38501

LOCATION: The proposed project located 8700 Ditty Road, Baxter, Putnam County,Tennessee (Latitude: 36.13673° N, Longitude: -85.617215°W). Waters of the U.S. proposed for impact is an adjacent wetland of an unnamed tributary to Mine Creek thatflows into Caney Fork (Center Hill Reservoir), Cumberland River Mile 309.0L. The proposed project is located within the Mine Lick Creek 051301080901 HUC-12watershed. The project site can be found on the TN COOKEVILLE WEST 7.5 Minute quadrangle maps. See Attachments 1-2, Site Location Maps.DESCRIPTION: The applicant proposes to construct tile manufacturing and warehousefacility with associated infrastructure. The project site is 92 acres and contains 4.76acres of jurisdictional wetlands and 920 linear feet of jurisdictional stream. Theinfrastructure includes roadways, 5 stormwater detention ponds, 1 potentialunderground detention pond, two parking areas for approximately 197 vehicles, 2sections of retaining wall, utility lines, and loading docks. The completed building will2,634.75 feet long and contain 1,500,00 square feet. The width of the building will rangefrom approximately 525 to 710 linear feet. See Attachments 3-5, Plans. If you wish to view additional plans, please visit our web site at:http://www.lrn.usace.army.mil/Media/PublicNotices.aspx

PURPOSE AND NEED: According to the permit application, the purpose of the proposed project is to construct a tile manufacturing plant and warehouse near Interstate 40 (I-40) in close proximity to raw materials necessary for the tile manufacturing process that will create important local economic opportunities for the City of Baxter and Putnam County, Tennessee. The proposed project will provide residents of Baxter and Putnam County a significant social and economic benefit including additional jobs, tax revenue and improved social benefits.

AVOIDANCE AND MINIMIZATION OF IMPACTS TO WATERS OF THE U.S.: According to the applicant, the currently proposed layout and preferred alternative avoids and minimizes impacts to aquatic resources to the maximum extent practicable. The applicant evaluated multiple alternatives to the proposed project, including no action, two (2) alternative sites and one (1) on-site alternative. According to the applicant, the no action alternative would not meet the project goals of developing a manufacturing facility within the geographic area targeted by the Applicant. This alternative would also fail to provide economic benefits for the City of Baxter, Putnam County, and local residents, such as job creation, investment in the local economy,and generating tax revenues from the site. The preferred project site is composed of 4.76 acres of jurisdictional wetlands and 920 linear feet of jurisdictional stream. The initial design of the project would impact 3.45 acres of wetland 642 linear feet of stream. The re-design and preferred layout of the facility will impact 1.93 acres of wetlands and 0 linear feet of stream. The project would avoid 2.83 acres of jurisdictional wetlands and 920 linear feet of jurisdictional stream. The preferred alternative satisfies the project purpose and need and selected because it would be the least damaging practicable alternative. The off-site alternatives are identified as Site 1 and Site 2. The proposed project at Site 1 would impact 0 acre of jurisdictional wetland and 4,500 linear feet of jurisdictional stream. The proposed project at Site 2 would impact 7.5 acres of jurisdictional wetlands and 6,056 linear feet of jurisdictional stream. Erosion Prevention and Sediment Control (EPSC) best management practices (BMPs) are to be installed and maintained during construction to reduce the likelihood of erosion and migration of sediment from the project site into adjacent environmental features.

COMPENSATORY MITIGATION: The applicant has proposed to mitigate for impacts to the 1.93 wetland acres by purchasing 6.0 wetland mitigation credits in the Upper Cumberland River Service Area provided by the Tennessee Mitigation Fund (TMF).

PUBLIC INTEREST REVIEW/CUMULATIVE EFFECTS: The decision whether to issue a permit will be based on an evaluation of the probable impacts including cumulative impacts of the activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the work must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the work will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people.

SOLICITATION OF COMMENTS: The U.S. Army Corps of Engineers (USACE) is soliciting comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the USACE to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment (EA) and/or an Environmental Impact Statement (EIS) pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. An EA will be prepared by this office prior to a final decision concerning issuance or denial of the requested DA permit.

HISTORIC AND CULTURAL RESOURCES: A Phase I Archaeological Survey has been conducted for the site. The results indicated no previously recorded archaeological sites are present within 1-mile radius of the project area. No cultural material was recovered and no intact subsurface deposits attributable to prehistoric activity were encountered. This Public Notice also serves to initiate public involvement requirements of Section 106 of the National Historic Preservation Act of 1996, as amended. The USACE invites responses to this public notice from Native American Tribes or tribal governments; Federal, State, and local agencies; historical and archeological societies; and other parties likely to have knowledge of or concerns regarding historic properties and sites of religious and cultural significance at or near the project area. Copies of this public notice are being provided to the State Historic Preservation Office (SHPO) and Native American Tribes. If the USACE determines that consultation is required, the USACE will consult with the Tennessee Historic Commission (SHPO) and American Indian Tribes in accordance with Section 106 of the National Historic Preservation Act, as appropriate.

ENDANGERED/THREATENED SPECIES REVIEW (Per Section 7 of the Endangered Species Act): The Endangered Species Act (ESA) requires federal agencies to consult with the U.S. Fish and Wildlife Service (USFWS) pursuant to Section 7 of ESA on all actions that may affect a species listed (or proposed for listing) under the ESA as threatened or endangered or any designated critical habitat. BDY Natural Sciences Consultants identified the federally-listed species that are known to or believed to occur in the vicinity of the proposed project in the table below.

Species Nomenclature

Federal Status

Freshwater Mussels

Clubshell (Pleurobema clava)

Endangered

Cumberland Bean (Villosa trabalis)

Endangered

Cumberlandian Combshell (Epioblasma brevidens)

Endangered

Dromedary Pearlymussel (Dromus dromas)

Endangered

Fanshell (Cyprogenia stegaria)

Endangered

Oyster Mussel (Epioblasma capsaeformis)

Endangered

Pink Mucket (pearlymussel) (Lampsilis abrupta)

Endangered

Rabbitsfoot (Quadrula cylindrica cylindrica)

Endangered

Sheepnose (Plethobasus cyphyus)

Endangered

Slabside Pearlymussel (Pleuronaia dolabelloides)

Endangered

Snuffbox Mussel (Epioblasma triquetra)

Endangered

Spectaclecase(Cumberlandia monodonta)

Endangered

White Wartyback(Plethobasus cicatricosus)

Endangered

Mammals

Gray Bat (Myotis grisescens)

Endangered

Indiana Bat (Myotis sodalis)

Endangered

Northern Long-Eared Bat (Myotis septentrionalis)

Threatened

No critical habitats were identified at the proposed project site. A copy of this notice is being furnished to the USFWS for their review. The USACE is requesting comments from the USFWS concerning potential impacts to threatened and/or endangered species pursuant to Section 7(a)(2) of the Endangered Species Act (ESA) of 1972, as amended. After receipt of comments, the USACE will evaluate the potential effects on proposedand/or listed species and their designated critical habitat and initiate consultation with USFWS, if required.

OTHER APPROVALS: Before a permit may be issued, water quality certification must be provided by the Tennessee Department of Environment and Conservation (TDEC) pursuant to Section 401(a)(1) of the CWA (33 U.S.C. 1341), that applicable water quality standards will not be violated. Other federal, state, and/or local approvals may be required for the proposed work.

PUBLIC HEARING REQUESTS: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing.

COMMENT PERIOD: Written statements received in this office within 30 days from the date of this notice will become a part of the administrative record and will be considered in the determination. Any response to this notice should reference LRN-2019-01118 and be directed to the Regulatory Branch, Attention: Gary L. Davis, at the above address, via phone 270-702-1312 or email at gary.l.davis@usace.army.mil.

\s\

Aurora Scott for Casey Ehorn Chief, East Permits Branch Regulatory Division U.S. Army Corps of Engineers - Nashville District

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas