STATE - Indiana:
APPLICANT - Indiana Department of Transportation:
PROJECT PURPOSE - To construct an additional travel lane along I-70.
This notice announces an application submitted for a Department of the Army (DA) Permit, subject
to Section 404 of the Clean Water Act (CWA).
APPLICANT: Indiana Department of Transportation
100 North Senate Ave, Room N642
Indianapolis, Indiana 46204
AGENT: RQAW
8770 North Street, Suite 110
Fishers, Indiana 46038
LOCATION: Wetlands AQ and AT, along south side of I-70 approximately 0.35
miles west of N 200 W bridge, Hancock County, Indiana.
Latitude: 39.82003°
Longitude: -85.846955°
7.5 Minute Quad: Greenfield, IN
PURPOSE: To construct an additional travel lane along I-70.
DESCRIPTION OF WORK: At Crossing 3, the applicant proposes the construction of an
additional travel lane along I-70. Project activities would include ditch regrading within
Wetlands AQ and AT for road widening and would require the discharge of 7,712 cubic yards of
clean earthen fill material. The impacts to wetlands would result in 2.39 acres of wetland loss.
Crossing 3 is a Single & Complete project and is being reviewed as a Standard Permit. It is part of
the larger I-70 Added Travel Lanes & Bridge Replacement project. The remaining Single &
Complete projects, Crossings 1, 2, 4, 5, 6, & 7 meet the terms and conditions of Indiana Regional
General Permit No. 1 (RGP 1).
AVOIDANCE, MINIMIZATION, AND MITIGATION MEASURES:
The proposed project has been designed to minimize impacts to wetlands, minimizing the use of
ditch regrading to greatest extent possible while accomplishing the overall project purpose and
need. In order to mitigate for unavoidable loss of emergent wetlands, the applicant proposes the
purchase of wetland mitigation credits from the Indiana Stream and Wetland Mitigation Program
(in-lieu fee).It is noted that this proposed mitigation plan is open to comment and subject to change. The Corps
will make a determination of appropriate mitigation, upon review of all submitted information.
REVIEW PROCEDURES: A DA Permit cannot be issued if any legally required Federal, State, or
local authorization or certification is denied.
A DA Permit, if otherwise warranted, will not be issued on this project until a State of Indiana
Section 401 Water Quality Certification (WQC) from the Indiana Department of Environmental
Management (IDEM) is on file in this office or it is considered waived. IDEM granted the 401
Water Quality Certification dated August 25, 2021.
Copies of this notice are sent to the appropriate Federal and State Fish and Wildlife Agencies.
Their views and comments are solicited in accordance with the Fish and Wildlife Coordination Act
of 1956. Based on available information, the proposed activity will not destroy or endanger any
Federally-listed threatened or endangered species or their critical habitats, as identified under the
Endangered Species Act, and therefore, initiation of formal consultation procedures with the U.S.
Fish and Wildlife Service is not planned at this time.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. A request for a public hearing must state the
specific interest which might be damaged by issuance of the DA Permit.
The National Register of Historic Places has been examined, and it has been determined that there
are no properties currently listed on the Register which would be directly affected by the proposed
work. If we are made aware, as a result of comments received in response to this notice, or by
other means, of specific archaeological, scientific, prehistoric, or historical sites or structures which
might be affected by the proposed work, the District Engineer will immediately take the
appropriate action necessary pursuant to the National Historic Preservation Act of 1966 – Public
Law 89-665 as amended (including Public Law 96-515).
The decision whether to issue a permit will be based on an evaluation of the probable impact of the
proposed activity on the public interest. That decision will reflect the national concern for both
protection and utilization of important resources. The benefits which reasonably may be expected
to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered; among those are conservation,
economics, aesthetic values, general environmental concerns, historic values, fish and wildlife
values, flood damage prevention, land use, navigation, recreation, water supply, water quality,
energy needs, safety, food production, and in general, the needs and welfare of the public. In
addition, the evaluation of the impact of the activity on the public interest will include application
of the guidelines (40 CFR Part 230) promulgated by the Administrator, United States
Environmental Protection Agency (USEPA), under authority of Section 404(b) of the CWA.
The Corps of Engineers is soliciting comments from the public; Federal, State, and local agencies
and officials; Indian tribes; and other interested parties in order to consider and evaluate the
impacts of this proposed activity. It is presumed that all interested parties and agencies will wish to
respond; therefore, a lack of response will be interpreted as meaning that there is no objection to the
proposed project. Any comments received will be considered by the Corps of Engineers todetermine whether to issue, modify, condition or deny a permit for this proposal. To make this
decision, comments are used to assess impacts on endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above. Comments
are used in the preparation of an Environmental Assessment and/or an Environmental Impact
Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the proposed
activity.
Written statements received in this office on or before the closing date will become a part of the
official record and will be considered in the determination on this permit request. Any objections
which are received during this period will be forwarded to the applicant for possible resolution
before the determination is made whether to issue or deny the requested DA Permit. A permit will
be granted unless its issuance is found to be contrary to the public interest.
Information pertaining to this application is available for public examination during normal
business hours upon prior request. Drawings are available on Louisville District's Internet site at
https://www.lrl.usace.army.mil/Missions/Regulatory/Public-Notices/. All comments regarding this
proposal should be addressed to Sara Mundy, CELRL-RDN at the address noted above and should
refer to the Public Notice Number LRL-2020-973-SCM.
If you desire to submit your comments by email, you must comply with the following:
a) In the subject line of your email, type in ONLY the Public Notice ID No. LRL-2020-973-SCM.
Example:
Subject: LRL-2020-973-SCM
b) Provide your physical mailing address and telephone number.
c) Send your email to: lrl.regulatorypubliccomment@usace.army.mil.
d) If you are sending attachments greater than 1 Mb in size with your email, you must send a
hard copy (CD or paper) to the Corps’ physical address as well.