You can copy from here when filling out the rest of the page.
Naval Station Norfolk is the homeport of numerous ships and provides operational readiness support to the U.S .Atlantic Fleet with its facilities. The deperming station is located within the waters of the Elizabeth River provides magnetic silencing services for military vessels. The proposed regulation is necessary to better protect underwater equipment, personnel, and vessels utilizing the facility by implementing a waterside security program. The applicant proposes to establish new restricted area in the Navigation Regulations (33 C.F.R. §334.296).
October 12, 2021
CENAO-WR-R
NAO-2019-01614
PUBLIC NOTICE
The District Commander has received a permit application for work described below:
APPLICANT
Commanding Officer
Naval Station Norfolk
Attn: CDR Gretchen Sosbee
1530 Gilbert Street, Suite 2000
Norfolk, Virginia 23511-2722
WATERWAY AND LOCATION OF THE PROPOSED WORK: The project is located inElizabeth River surrounding the Naval Station Norfolk Lambert’s Point DepermingStation in Norfolk, Virginia.
PROPOSED WORK AND PURPOSE: Naval Station Norfolk (NSN) is the homeport of numerous ships and provides operational readiness support to the US Atlantic Fleetwith its facilities. The deperming station is located within the waters of the ElizabethRiver provides magnetic silencing services for military vessels. The proposed regulationis necessary to better protect underwater equipment, personnel, and vessels utilizingthe facility by implementing a waterside security program. The applicant proposes toestablish new restricted area in the Navigation Regulations, (33 C.F.R. §334.296), asfollows:334.296 Elizabeth River, Deperming Station, Norfolk, VA, Restricted Area.
(a) The areas. The datum for the coordinate for the restricted area described in thissection is WGS84.
(b) The waters within an area beginning at a point latitude 36 deg.51'52” N, longitude 76deg.20'04" W; thence easterly to a point at latitude 36 deg.51’ 52” N, longitude 76deg.19'49" W, thence northerly to latitude 36 deg.52’06” N, longitude 76 deg.19'48" W;thence northwesterly to latitude 36 deg.52'12" N, longitude 76 deg.19'57" W; thencenorthwesterly to a point at latitude 36 deg.52'15" N, longitude 76 deg.19'59" W; thencewesterly to latitude 36 deg.52'15" N, longitude 76 deg.20'04” W, thence to the point oforigin.
(c) The regulations.
(1) No vessels other than vessels of the U.S. armed forces and other authorized vesselsshall enter the restricted area. Other authorized vessels include vessels and personnel,including contactors and agents, acting on behalf of any Federal or state agency ordepartment performing specific work authorized as part of that agency or department'sstatutory missions or to enforce their respective laws. Authorized vessels may enteranywhere in the restricted area at any time in the furtherance of their authorizedoperations. This includes, but is not limited to, vessels that are engaged in the followingoperations:
(a) Law enforcement,
(b) Servicing aids to navigation and/or
(c) Surveying,maintenance, or improvement of the Federal navigational channel.
(2) There shall be no introduction of external magnetic field sources within the area.
(3) No person or vessel shall at any time, under any circumstances, anchor or fish ortow a drag of any kind in the restricted area due to the risk of damage to missionessential underwater equipment including an extensive cable system located therein.
(4) Orders and instructions issued by U.S. Navy patrol craft or other authorizedrepresentatives of the enforcing agency shall be carried out promptly by persons orvessels in or in the vicinity of the restricted area.
(5) The regulations in this section shall be enforced by the Commanding Officer, U.S.Naval Station, Norfolk, Virginia and such agencies as he/she may designate.
AUTHORITY: Section 7 of the Rivers and Harbors Act of 1917 (40 Stat. 266; 33 U.S.C.1) and Chapter XIX of the Army Appropriations Act of 1919 (40 Stat. 892; 33 U.S.C. 3).
FEDERAL EVALUATION OF APPLICATION: The decision whether to create therestricted area will be based on an evaluation of the probable impact includingcumulative impacts of the proposed activity on the public interest. The decision willreflect the national concern for both protection and utilization of important resources.The benefits which reasonably may be expected from the proposal must be balancedagainst its reasonably foreseeable detriments. All of the proposal's relevant factors willbe considered, including conservation, economics, aesthetics, general environmentalconcerns, wetlands, cultural values, fish and wildlife values, flood hazards, flood plainvalues, land use classification, navigation, shoreline erosion and accretion, recreation,water supply and conservation, water quality, energy needs, safety, food and fiberproduction, mineral needs, consideration of property ownership and, in general, theneeds and welfare of the people.
The Corps of Engineers is soliciting comments from the public; Federal, state, and localagencies and officials; Indian Tribes; and other interested parties in order to considerand evaluate the direct, indirect, and cumulative impacts of this proposed activity. Anycomments received will be considered by the Corps of Engineers to determine whetherto issue, modify, condition or deny a permit for this proposal. To make this decision,comments are used to assess impacts on endangered species, historic properties,water quality, general environmental effects, and the other public interest factors listedabove.
Comments are used in the preparation of an Environmental Assessment and/oran Environmental Impact Statement pursuant to the National Environmental Policy Act.Comments are also used to determine the need for a public hearing and to determinethe overall public interest of the proposed activity. Anyone may request a public hearingto consider this permit application by writing to the District Commander within 30 days ofthe date of this notice, stating specific reasons for holding the public hearing. TheDistrict Commander will then decide if a hearing should be held.
Preliminary review indicates that:
(l) no environmental impact statement will berequired;
(2) after conducting the NAO ESA Project Review Process, nolisted/proposed/candidate species and/or designated/proposed critical habitat under theEndangered Species Act of 1973 (16 U.S.C. 1531-1544, 87 Stat. 884), as amended) willbe affected. Based on this no effect determination, no further coordination with the Fishand Wildlife Service is required; and,
(3) there are known properties eligible for inclusionor included in the National Register of Historic Places are in or near the permit area,however they are not likely be affected by the proposal. Additional information mightchange any of these findings.
The Magnuson-Stevens Fishery Conservation and Management Act, as amended bythe Sustainable Fisheries Act of 1996 (Public Law 104-267), requires all Federalagencies to consult with the National Marine Fisheries Service on all actions, orproposed actions, permitted, funded, or undertaken by the agency, that may adverselyaffect Essential Fish Habitat (EFH). The Elizabeth River contains Essential FishHabitat (EFH) for the juvenile and adult life stages of eleven species including Littleskate (Leucoraja erinacea), Atlantic herring (Clupea harengus), Red hake(Urophycischuss), Winter skate (Leucoraja ocellata), Clearnose skate (Raja eglanteria),windowpane flounder (Scopthalmus aquosus), bluefish (Pomatomus saltatrix), Atlanticbutterfish (Peprilus triancanthus), summer flounder (Paralicthys dentatus), black seabass (Centropristus striata), and sandbar shark (Charcharinus plumbeus).
The habitatwhich this project would affect consists of open water. The proposed project isdescribed in PROPOSED WORK AND PURPOSE, above. Our assessment of theproject leads us to a preliminarydetermination that it will not have a substantial adverseeffect on EFH and therefore expanded EFH consultation is not required. Our rationalefor this preliminary determination is based on the minimal direct impacts associated withthe establishment of restricted areas and danger zones. Based on comments from theNational Marine Fisheries Service in response to this public notice, further EFHconsultation may be necessary.
COMMENT PERIOD: Comments on this project should be in writing and can be sentby either email to nicole.l.woodward@usace.army.mil, or by regular mail, addressed tothe Norfolk District, Corps of Engineers (ATTN: CENAO-WR-R), 803 Front Street,Norfolk, Virginia 23510-1011, and should be received by the close of business onNovember 7, 2021.
PRIVACY & CONFIDENTIALITY: Comments and information, including the identity ofthe submitter, submitted in response to this Public Notice may be disclosed,reproduced, and distributed at the discretion of the U.S. Army Corps of Engineers.Information that is submitted in connection with this Public Notice cannot be maintainedas confidential by the U.S. Army Corps of Engineers. Submissions should not include any information that the submitter seeks to preserve as confidential.
If you have any questions about this project or the permit process, contact
Nicole Woodward at 757-201-7122.
Attachment: Drawings