COMERCIAL DEVELOPMENT ON THE HOUMA NAVIGATION CANAL IN TERREBONNE PARISH

NAME OF APPLICANT: Poule Deau Properties LLC, c/o: AUX, LLC, 214 Pamela Place, Thibodaux, LA 70301.

LOCATION OF WORK: Located in Terrebonne Parish on the Houma Navigation Canal, off LA State Highway 315, in Dularge, Louisiana, (lat. 29 33 54, long. -90 43 00) in Sections 47,48, 104 T17S-R17E, as shown within the attached drawings.

The work described below was partially completed prior to obtaining a Department of the Army permit and was in violation of Section 301 of the Clean Water Act. All legal issues concerning the unauthorized work have since been deferred.

CHARACTER OF WORK: Clear, grade, excavate and deposit earthen and aggregate fill to develop an industrial site with boat and barge facilities, covered boat sheds, metal buildings and limestone roads and parking areas, in Terrebonne Parish. The purpose of the proposed development is to conduct industrial business along the Houma Navigation Canal. The project will be located on a 48.4-acre tract of land located off of Highway 315 and will impact approximately 15 acres of jurisdictional marsh habitat through filling 8.75 acres and 6.35 acres through excavation operations. Fill operations will include the deposition of approximately 18,435 cubic yards of earthen material into wetlands, as foundation for roadways, buildings, work amenities, facilities, and parking. Excavation operations will include 14,500 cubic yards of material removed from wetlands to create a barge slip. If a Department of the Army permit is warranted, the applicant has proposed to mitigate unavoidable wetlands impacts at an approved and acceptable mitigation bank within the N.O. District.

The applicant may be required to fully or partially restore the site to pre-project conditions if issuance of a permit is determined to be contrary to the public interest.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice