SUBJECT: This notice announces a prospectus has been submitted for the development of the Pressman
SUBJECT: This notice announces a prospectus has been submitted for the development of the Pressman Mitigation Bank (PMP) pursuant to 33 CFR 332, Compensatory Mitigation for Losses of Aquatic Resources (Federal Register: April 10, 2008, effective June 9, 2008).
TO ALL CONCERNED: The application described below has been submitted for a Department of the Army (DA) Permit pursuant to Section 404 of the Clean Water Act (CWA) (33 U.S.C. 1344).
APPLICANT: Davey Mitigation
1500 N. Mantua St.
Kent, OH 44240
PURPOSE: The PMB is proposed to provide compensatory stream and wetland mitigation for permitted impacts within the Primary Service Area of the Holston River (06010104) HUC 8 watershed. The proposed Secondary Service Areas are the Upper Clinch River (06010205) HUC 8 watershed, South Fork Holston River (06010102) HUC 8 watershed, Nolichucky River (06010108) HUC 8 watershed, Lower French Broad (06010107) HUC 8 watershed, Powell River (06010207) HUC 8 watershed, and Watts Bar Lake (06010201) HUC 8 watershed.LOCATION: The PMB is approximately 88 acres in size and is located in east central Tennessee, approximately four miles northwest of the Town of Rogersville in southwestern Hawkins County adjacent to the historic Pressman’s Home landmark. The site is situated along TN-94 within the relic golf course portion of the Pressman property, (36.444428, -83.064160).
GENERAL INFORMATION: Mitigation banks are defined as a site, or suite of sites, where aquatic resources (e.g., wetlands, streams, riparian areas) are restored, established, enhanced, and/or preserved for the purpose of providing compensatory mitigation for impacts authorized by Department of the Army (DA) permits pursuant to Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act.In general, units of restored, established, enhanced or preserved wetlands or streams are expressed as “credits” which may subsequently be withdrawn to offset “debits” incurred at a permitted project site. In this way, a permit requirement to provide compensatory mitigation can be transferred to the mitigation bank sponsor.The operation and use of mitigation banks are governed by an approved mitigation banking instrument (MBI).The MBI is the legal document for the establishment, operation and the use of a mitigation bank.This bank is intended to be a private commercial bank.The sponsor would be responsible for the successful development of the mitigation bank including monitoring and reporting requirements.
A group of federal and state regulatory and resource agency representatives known as the Interagency Review Team (IRT) would oversee the establishment and management of the bank.The IRT is chaired by the US Army Corps of Engineers, Nashville District (USACE).The primary role of the IRT is to facilitate the establishment of the mitigation bank through the development of a MBI.The IRT will review the prospectus, instrument, and other appropriate documents and provide comments to the USACE.
The approval for the use of the bank for specific projects is the decision of the USACE pursuant to Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act and/or the Tennessee Department of Environmental Conservation (TDEC) pursuant to Section 401 of the CWA and/or applicable state of Tennessee statute(s) and regulation(s).The USACE and TDEC provide no guarantee that any particular individual or general permit would be authorized in order to use the bank for compensation.The following is a summary of the prospectus for this project.
PROJECT DESCRIPTION: The Bank site currently consists of approximately 12,803 linear feet of the main channel of Little Poor Valley Creek and several of its unnamed tributaries. The major stressors along the project streams are the results of active golf course maintenance. Stressors contributing to stream impairment along the golf course include culverts, impoundments, and mowing of the riparian areas. Many of the waterways on the parcel have been either channelized, buried, encapsulated, impounded, relocated, or bermed to accommodate the golf course property use. The golf course was recently an actively maintained facility that included routine mowing, grooming, and chemical applications to the greens, fairways, and rough, which were potentially contributing to water quality problems (i.e. nutrient loading, turbidity, TSS, and temperature).
The Bank will consist of the restoration of approximately 17,964 linear feet of the main channel and unnamed tributaries to Little Poor Valley Creek using natural channel design techniques to provide a functional lift capable of restoring natural channel hydrology, hydraulic, geomorphic, physicochemical, and biological functions. There are also several ponds within the project site that offer restoration opportunity.
The primary goal for wetland restoration will be to restore wetland hydrology throughout adjacent floodplain areas along Little Poor Valley Creek by reversing historical impacts which include tile drains and channelization and restoring vegetation, with the goal of restoring forested wetlands. Both the goals and objectives of this project will focus on improving floodplain connectivity, lateral migration, bed form diversity, and riparian vegetation.
The project prospectus can be viewed at: http://www.lrn.usace.army.mil/Media/PublicNotices.aspx. Information in the mitigation plan would serve as the basis for deriving and releasing credits for themitigation bank.
HISTORIC AND CULTURAL RESOURCES: An investigation of the online Tennessee Historical Commission (THC) Viewer revealed one previously identified resource (HW-2274) within the project Limits of Disturbance (LOD), 14 resources in close proximity, and one additional resource within an approximately 0.5 mi radius of the proposed project. The majority of these resources are associated with the NRHP-listed Pressmen’s Home Historic District, which intersects with the project area. At this early stage in the regulatory process, no project design plans have been submitted; therefore, USACE cannot complete an effects determination for historic and cultural resources. The Corps invites responses to this public notice from American Indian Tribes or tribal governments; Federal, State, and local agencies; historical and archeological societies; and other parties likely to have knowledge of or concerns regarding historic properties and cultural significance at or near the project area. Upon submittal of the design plans, USACE will evaluate the design plans along with any substantive comments from this public notice to determine the potential of impacts to historic and cultural resources for Section 106 compliance. If the Corps determines that consultation is required, the Corps would consult with the Tennessee Historic Commission (SHPO) and American Indian Tribes.
ENDANGERED/THREATENED SPECIES REVIEW:A review of the United States Fish and Wildlife Service (USFWS) website,http://ecos.fws.gov/ipacidentified the following federally-listed species that are known to or believed to occur in Hawkins County, Tennessee:
Species
Scientific Name
Federal Status
Mammals
Myotis grisescens (Gray Bat)
Endangered
Myotis sodalis (Indiana Bat)
Endangered
Myotis septentrionalis (Northern Long-Eared Bat)
Threatened
Fishes
Erimystax cahni (Slender Chub)
Threatened
Freshwater Mussels
Lemiox rimosus (Birdwing Pearlymussel)
Endangered
Vilosa trabalis (Cumberland Bean)
Endangered
Quadrula intermedia (Cumberland Monkeyface)
Endangered
Dromus dromas (Dromedary Pearlymussel)
Endangered
Fusconaia cuneolus (Finerayed Pigtoe)
Endangered
Epioblasma turgida (Turgid Blossom)
Endangered
OTHER APPROVALS: Water Quality Certification from Tennessee Department of Environment and Conservation (TDEC) pursuant to Section 401 (a)(1) of the CWA is required for the proposed project.Other federal, state, and/or local approvals may be required for the proposed work.
COMMENT PERIOD: Written statements received in this office within 30 days from the date of this notice will become a part of the record and will be considered in the determination.Any response to this notice should be directed to the Nashville District Corps of Engineers, Regulatory Division, Attention: Mr. Ryan Evans at the above address or by email:ryan.evans@usace.army.mil
/s/
Joshua W. Frost
Chief, Technical Services Branch
Regulatory Division
U.S. Army Corps of Engineers