You can copy from here when filling out the rest of the page.
(5) WATERWAY GATED CLOSURES IN TERREBONNE PARISH
NAME OF APPLICANT: Shell Pipeline Company, LP, c/o: T. Baker Smith, LLC, P.O. Box 2266, Houma, Louisiana 70361.
LOCATION OF WORK: Located in Terrebonne Parish, Section 0, Township 00S and Range 00E, located off of Shell’s existing Ship Shoal Pipeline, near Hellhole Bayou, Bay Junop, Fiddler’s Lake, Buckskin Bayou and Eagle Lake, centrally located at (lat. 29 13 24.35, long. -91 4 39.43), as shown within the attached drawings.
CHARACTER OF WORK: Install timber supported gates within waterways crossing the Shell Ship Shore Pipeline to prevent access. Gates are proposed at five (5) locations along the pipeline canal. The proposed project does not include a discharge of fill material or include wetland impacts or effects to special aquatic sites. The applicant has not proposed to provide compensatory mitigation, as there are no plans to impact wetland resources through project construction.