You can copy from here when filling out the rest of the page.
The U.S. Army Corps of Engineers Los Angeles District has prepared the Final Environmental Assessment dated August 2021, for the San Gabriel River and San Jose Creek Confluence Sediment and Vegetation Removal Project.
The U.S. Army Corps of EngineersLos Angeles Districthas conducted anenvironmental analysis in accordance with the National Environmental Policy Act of 1969,as amended. The Final Environmental Assessmentdated August 2021, for the San Gabriel River and San Jose Creek Confluence Sediment and Vegetation Removal Projectaddresses the accumulated sediment and vegetation creating impinged river flow,scouring of the levee and exceedance the 15-degree entrance angle requirement fordesign of a channel confluence. The purpose of the project is to relieve theimpinged flows that are actively scouring and damaging the levee and restore the 15-degree entrance angle requirement for design of a channel confluence through theremoval of accumulated excess sediment and vegetation.