You can copy from here when filling out the rest of the page.
In compliance with U.S.C. Title 33, Chapter 9, Subchapter 1, Section 408, the Ideatek (requester) has requested permission from the U.S. Army Corps of Engineers (USACE) for the placement of a 3-inch pipe to contain fiber optic cable below the Hutchinson Levee A & E.
Ideatek proposes to construct a single shot, horizontal directional bore and placement of a 3-inch diameter steel pipe to contain a fiber optic cable. Bore head will be 8-inches or less. Bore profile will be outside critical zones of the Hutchinson Levee A & E defined as 300-feet perpendicular to the levee centerline and vertically 2x the levee maximum height.