The applicant proposes to continue construction of a barge fleeting area and 10-year maintenance dredging authorization.

Full Public Notice Project Plans

PROJECT DESCRIPTION: The applicant proposes to continue construction of a barge fleeting area and 10-year maintenance dredging authorization. Activities include dredging 35,500 cubic yards of material from a 10.3-acre area to a depth of -7 feet mean low water (-8 feet mean lower low water), discharge of material into a previously authorized placement area onsite, discharge return water into the GIWW, and install eleven, 36-inch-diameter monopiles along 1,580 feet along the south shore of the GIWW.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas