The sponsor proposes to establish, design, construct and operate a compensatory stream mitigation site to be known as the South Anna River at Ashland Mill Dam Mitigation Bank, to provide off-site compensatory mitigation for projects that result in unavoidable impacts to streams and other waters of the United States in the Pamunkey River and Lower Chesapeake Bay Drainage Basins.

December1, 2021 CENAO-WRR NAO-2020-00707

FEDERAL PUBLIC NOTICE

The District Engineer received a prospectus to establish a stream compensatorymitigation site for federal and state permits as described below: BANK/ILF SPONSOR Restoration Systems, LLC. c/o George Howard, Jeff Corbin, John Preyer and Wes Newell 1101 Haynes Street, Suite 211 Raleigh, North Carolina 27604

WATERWAY AND LOCATION OF THE PROPOSED WORK: The proposed mitigationsite is located on approximately 2.6 acres of private, commercial and public land. Thesite is located in the South Anna River in Hanover, Virginia.

PROPOSED WORK AND PURPOSE: The sponsor proposes to establish, design,construct, and operate a compensatory stream mitigation site to be known as the SouthAnna River at Ashland Mill Dam Mitigation Bank. The purpose of the mitigation projectis to provide off-site compensatory mitigation for projects that result in unavoidableimpacts to streams and other waters of the United States in the Pamunkey River andLower Chesapeake Bay Drainage Basins.

The Sponsor plans to restore approximately 12,250 linear feet and 21 acres of instream,aquatic habitat long the South Anna River in Hanover County, Virginia. To doso, the Sponsor proposes to dewater the impoundment and deconstruct the existingAshland Mill Dam. After removal of the dam, the Sponsor will regrade and seed thebanks in the vicinity of the construction activity, as well as modify the stream bed withinthe project area as needed to provide a stable transition between the upstream anddownstream areas.

The sponsor proposed, for purposes of Section 404 of the Clean Water Act, that thegeographic service area of this mitigation site would include the National WatershedBoundary Dataset Hydrologic Unit Codes 02080101, 02080102, 02080103, 02080104,02080105, 02080106, 02080107, 02080108, 02080201, 02080202, 02080203,02080204, 02080205, 02080206, 02080207, 02080208. This proposed service areawould include portions of the Cities and Counties of Virginia Beach, Norfolk,Portsmouth, Chesapeake, Suffolk, Isle of Wight, Surry, Prince George, Hopewell,Chesterfield, Colonial Heights, Petersburg, Dinwiddie, Amelia, Nottoway, PrinceEdward, Appomattox, Campbell, Amherst, Lynchburg, Bedford, Nelson, Charlottesville,Cumberland, Buckingham, Albemarle, Cullpepper, Stafford, Fredericksburg, KingGeorge, Richmond, Westmoreland, Essex, Lancaster, Spotsylvania, Orange, Fluvanna,Goochland, Powhatan, Louisa, Hanover, Henrico, Richmond City, Charles City, NewKent, James City, Williamsburg, York, Newport News, Hampton, Poquoson, Gloucester,Mathews, Middlesex, Fauquier,Rappahannock, Madison, Greene, King and Queen,King William, Caroline, Northumberland, Highland, Bath, Alleghany, Craig, Botetourt,Rockbridge, and Augusta.

Oversight of this mitigation site would be by an existing group of federal and stateagency representatives. This interagency oversight group is known as the InteragencyReview Team (IRT). The Norfolk District of the U.S. Army Corps of Engineers and theVirginia Department of Environmental Quality chair the IRT.

This mitigation site may be one of a number of practicable options available toapplicants to compensate for unavoidable wetland impacts associated with permitsissued under the authority of Section 404 and 401 of the Clean Water Act (Public Law95-217) in Virginia.

The actual approval of the use of this mitigation site for a specific project is the decisionof the Corps pursuant to Section 404 of the Clean Water Act and/or by the Departmentof Environmental Quality pursuant to Section 401 of the Clean Water Act and Title 62.1of the Code of Virginia. The Corps and the Department of Environmental Quality provideno guarantee that any particular individual or general permit will be grantedauthorization to use this mitigation site to compensate for unavoidable wetland impactsassociated with a proposed permit. Authorization by the Virginia Marine ResourcesCommission may also be required for its use for specific projects.

AUTHORITY: Issuance of a public notice regarding proposed mitigation sites isrequired pursuant to the “Compensatory Mitigation for Losses of Aquatic Resources;Final Rule,” (Rule) as published in the April 10, 2008, Federal Register, Vol. 73, No. 70,Pages 19594-19705 (33 CFR Parts 325 and 332).

FEDERAL EVALUATION OF PROPOSAL: The Corps of Engineers is solicitingcomments from the public; federal, state, and local agencies and officials; Indian Tribes;and other interested parties in order to consider and evaluate this proposed mitigationsite. This is not an application for work in Waters of the United States. The Corpsof Engineers in evaluating this proposal will consider any comments received.

Comments are used to assess impacts on endangered species, historic properties,water quality, conservation, economics, aesthetics, general environmental concerns,wetlands, fish and wildlife values, flood hazards, flood plain values, land use,navigation, shoreline erosion and accretion, recreation, water supply and conservation,water quality, energy needs, safety, food and fiber production, mineral needs, andconsideration of property ownership.

Preliminary review indicates that: (1) no environmental impact statement would berequired; (2) after conducting the NAO ESA Project Review Process, there may be anaffect tolisted/proposed/candidate species and/or designated/proposed critical habitatunder the Endangered Species Act of 1973; and (3) known properties potentially eligiblefor inclusion or included in the National Register of Historic Places are in or near thepermit area, or would likely be affected by the proposal. Additional information mightchange any of these findings.

The Magnuson-Stevens Fishery Conservation and Management Act, as amended bythe Sustainable Fisheries Act of 1996 (Public Law 104-267), requires all federalagencies to consult with the National Marine Fisheries Service on all actions, orproposed actions, permitted, funded, or undertaken by the agency, that may adverselyaffect Essential Fish Habitat (EFH). Review of the NOAA EFH mapper indicates theSouth Anna River does not contain Essential Fish Habitat (EFH). The habitat which thisproject would affect consists of an impounded riverine system with a course substrate.

The proposed project is described in Proposed Work and Purpose, above. Ourassessment of the project leads us to a preliminary determination that it will not have asubstantial adverse effect on EFH and therefore expanded EFH consultation is notrequired. Our rationale for this preliminary determination is based on the expectedshort-term nature of the direct impacts associated with the dam removal project and thelong-term benefits that the dam removal project will have on the waterway by improvingwater quality and reopening historic reaches of the South Anna River for resident,diadromous and anadromous fish species. Based on comments from the NationalMarine Fisheries Service in response to this public notice, further EFH consultation maybe necessary.

COMMENT PERIOD: Comments on this project should be made in writing, addressedto the Norfolk District, Corps of Engineers- (ATTN: CENAO-WRR), 803 Front Street,Norfolk, Virginia 23510-1096, and should be received by the close of business on December 31, 2021. The Prospectus and Drawings can be viewed athttps://ribits.ops.usace.army.mil/ords/f?p=107:10:::::P10_BANK_ID:6063(recommended to view link in Chrome).

If you have any questions about this mitigation site, please contact:Nicole Woodward at 757-201-7122 or nicole.l.woodward@usace.army.mil

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas