Thomas & Hutton Engineering is placing a series of temporary buoys around Cumberland River miles 189-190 between the I-65 Bridge and the Jefferson Street Bridge beginning Friday, Dec. 3, 2021.
Thomas & Hutton Engineering is placing a series of temporary buoys around Cumberland River miles 189-190 between the I-65 Bridge and the Jefferson Street Bridge beginning Friday, Dec. 3, 2021. There are a total of eight buoys placed on both sides of the river - three on left descending bank, and five on right descending bank. They are 20-inch red round buoys with reflective tape that will be anchored to the river bed using cinderblocks. These buoys will be in place for approximately one month and will be removed in early January 2022. For more information, call Chad Grass at 912-429-8349 or e-mail at grass.c@tandh.com.