You can copy from here when filling out the rest of the page.
The applicant proposes a modification to an existing permit, SWG-2008-00319.
Full Public Notice Project Plans
The applicant proposes a modification to an existing permit, SWG-2008-00319. Such activities include the installation of an approximate 905-linear-foot, sheet pile bulkhead wall, supported by batter piles. Piles will be driven from a barge mounted pile driving hammer stationed directly in front of the existing bulkhead wall. The construction of the bulkhead wall will require the discharge of approximately 16,500 cubic yards (0.06 acre) of clean back-fill material below the MHW line and within open water areas located behind the alignment of the proposed bulkhead wall.