A Draft Environmental Assessment (EA) has been prepared to analyze the impacts of the proposed Third Port Improvements Project at Joint Base Langley-Eustis

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

A Draft Environmental Assessment (EA) has been prepared to analyze the impacts of the proposed Third Port Improvements Project at Joint Base Langley-Eustis, Fort Eustis (JBLEEustis), Virginia (hereinafter “Proposed Action” or “Third Port Improvements Project”). The Proposed Action involves preparing the Third Port facility for the assignment of a new vessel class at the port. The Proposed Action includes replacing the finger piers with the addition of a wave screen and stern ramp and deepening the berthing area, realigning the mooring field and constructing a sill to reduce sediment accretion in the channel, deepening the access area between the mooring field and channel, adding fendering and catwalks to the Landship, and constructing a sill near the general’s ramp.

PUBLIC NOTICE OF AVAILABILITY

DRAFT ENVIRONMENTAL ASSESSMENT ANDPROPOSED FINDING OF NO SIGNIFICANT IMPACT / FINDING OF NO PRACTICABLE ALTERNATIVE FOR THE PROPOSED THIRD PORT IMPROVEMENTS PROJECT AT JOINT BASE LANGLEY-EUSTIS, FORT EUSTIS, VIRGINIA

A Draft Environmental Assessment (EA) has been prepared to analyze the impacts of theproposed Third Port Improvements Project at Joint Base Langley-Eustis, Fort Eustis (JBLEEustis),Virginia (hereinafter “Proposed Action” or “Third Port Improvements Project”). TheProposed Action involves preparing the Third Port facility for the assignment of a new vessel classat the port. The Proposed Action includes replacing the finger piers with the addition of a wavescreen and stern ramp and deepening the berthing area, realigning the mooring field andconstructing a sill to reduce sediment accretion in the channel, deepening the access areabetween the mooring field and channel, adding fendering and catwalks to the Landship, and constructing a sill near the general’s ramp.

The Draft EA has been prepared in accordance with the National Environmental Policy Act(NEPA), Council on Environmental Quality (CEQ) regulations, and Air Force instructions implementing NEPA. The Draft EA evaluates the potential environmental impacts of the ProposedAction, two Action Alternatives, and the No-Action Alternative. Based on the analysis presentedin the Draft EA, the Air Force has prepared a proposed Finding of No Significant Impact (FONSI).In addition, a proposed Finding of No Practicable Alternative (FONPA) has been preparedpursuant to Executive Order 11990, Wetlands Protection, because there is not practicablealternative to the Third Port Improvements Project that would avoid indirect impacts to regulatedwetlands.

This Draft EA and proposed FONSI and FONPA are being made available for public review andcomment for a 30-day period from 20 December 2021 to 18 January 2022. Due to current COVID-19 restrictions, hard copies of the Draft EA and proposed FONSI and FONPA will not be made available. Instead, documents are available to review at the 733d Civil Engineer Squadron (CES),Environmental Element webpage (www.jble.af.mil/Units/Army/Eustis-Environmental/) andthe USACE Norfolk District (www.nao.usace.army.mil/) website.

You are encouraged to submit written comments by email at shannon.j.reinheimer@usace.army.milor by mail at Norfolk District, Corps of Engineers,Operations Branch, 803 Front St, Norfolk, VA 23510 within 30 days of this notice.

PRIVACY ADVISORY NOTICE Public comments on this Draft EA are requested pursuant to NEPA, 42 United States Code 4321,et seq. All written comments received during the comment period will be made available to thepublic and considered during the final EA preparation. Providing private address information withyour comment is voluntary and such personal information will be kept confidential unless releaseis required by law. However, address information will be used to compile the project mailing listand failure to provide it will result in your name not being included on the mailing list.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas