Home

Louisville District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

PUBLIC NOTICE FOR FEDERAL REGISTER NOTICE ANNOUNCING THE REISSUANCE OF THE NATIONWIDE PERMITS

PUBLIC NOTICE FOR FEDERAL REGISTER NOTICE

ANNOUNCING THE REISSUANCE OF THE NATIONWIDE PERMITS

On December 27, 2021, the U.S. Army Corps of Engineers (Corps) published a final rule in the Federal Register (86 FR 73522) announcing the reissuance of 40 existing nationwide permits (NWPs) and one new NWP. These 41 NWPs will go into effect on February 25, 2022, and they will expire on March 14, 2026:

NWP 1 – Aids to Navigation NWP 2 – Structures in Artificial Canals NWP 3 – Maintenance NWP 4 – Fish and Wildlife Harvesting, Enhancement, and Attraction Devices and Activities NWP 5 – Scientific Measurement Devices NWP 6 – Survey Activities NWP 7 – Outfall Structures and Associated Intake Structures NWP 8 – Oil and Gas Structures on the Outer Continental Shelf NWP 9 – Structures in Fleeting and Anchorage Areas NWP 10 – Mooring Buoys NWP 11 – Temporary Recreational Structures NWP 13 – Bank Stabilization NWP 14 – Linear Transportation Projects NWP 15 – U.S. Coast Guard Approved Bridges NWP 16 – Return Water From Upland Contained Disposal Areas NWP 17 – Hydropower Projects NWP 18 – Minor Discharges NWP 19 – Minor Dredging NWP 20 – Response Operations for Oil or Hazardous Substances NWP 22 – Removal of Vessels NWP 23 – Approved Categorical Exclusions NWP 24 – Indian Tribe or State Administered Section 404 Programs NWP 25 – Structural Discharges NWP 27 – Aquatic Habitat Restoration, Establishment, and Enhancement Activities NWP 28 – Modifications of Existing Marinas NWP 30 – Moist Soil Management for Wildlife NWP 31 – Maintenance of Existing Flood Control Facilities NWP 32 – Completed Enforcement Actions NWP 33 – Temporary Construction, Access, and Dewatering NWP 34 – Cranberry Production Activities NWP 35 – Maintenance Dredging of Existing Basins NWP 36 – Boat Ramps NWP 37 – Emergency Watershed Protection and Rehabilitation NWP 38 – Cleanup of Hazardous and Toxic Waste NWP 41 – Reshaping Existing Drainage Ditches NWP 45 – Repair of Uplands Damaged by Discrete Events NWP 46 – Discharges in Ditches NWP 49 – Coal Remining Activities NWP 53 – Removal of Low-Head Dams NWP 54 – Living Shorelines NWP 59 – Water Reclamation and Reuse Facilities

The new NWP 59 authorizes discharges of dredged or fill material into waters of the United States for the construction, expansion, and maintenance of water reclamation and reuse facilities.

The Corps has also issued final decision documents for these new and reissued

NWPs. These final decision documents are available at www.regulations.gov at docket number COE-2020-0002.

The 40 existing NWPs published in the December 27, 2021, final rule, replace the 2017 versions of these NWPs. The 2017 versions of NWPs 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 13, 14, 15, 16, 17, 18, 19, 20, 22, 23, 24, 25, 27, 28, 30, 31, 32, 33, 34, 35, 36, 37, 38, 41, 45, 46, 49, 53, and 54 expire on February 24, 2022.

The NWP general conditions and definitions that were issued in the final rule that was published in the January 13, 2021, issue of the Federal Register (86 FR 2744) apply to the 40 reissued NWPs and the new NWP 59 that were published in the Federal Register on December 27, 2021.

With the publication of this Federal Register notice, Corps divisions will begin finalizing regional conditions for these 41 NWPs. Division Engineers will prepare supplemental documentation to address decisions concerning the addition of regional conditions to the 41 NWPs. Regional conditions will provide additional protection for the aquatic environment; and will help ensure that the NWPs authorize only those activities that have no more than minimal adverse environmental effects. Regional conditions will help ensure protection of high value waters within the state of Indiana.

Corps divisions and districts will also begin determining which conditions for water quality certifications issued by states, tribes, and EPA for the issuance of these 41 NWPs become regional conditions of these NWPs. Corps divisions and districts will also begin determining which conditions for Coastal Zone Management Act consistency concurrences issued by states for the issuance of these 41 NWPs become regional conditions of these NWPs. Water quality certification and Coastal Zone Management Act consistency regional conditions will be announced in a future public notice issued by the Louisville District.

The December 27, 2021, Federal Register notice is available for viewing at https://www.federalregister.gov/documents/2021/12/27/2021-27441/reissuance-and-modification-of-nationwide-permits

The January 13, 2021, Federal Register notice is available for viewing at: https://www.federalregister.gov/documents/2021/01/13/2021-00102/reissuance-and-modification-of-nationwide-permits

As an alternative, interested parties can access the December 27, 2021, and January 13, 2021, final rules and related documents at: https://www.usace.army.mil/Missions/Civil-Works/Regulatory-Program-and-Permits/Nationwide-Permits/

Index of 2021 Nationwide Permits, Conditions, District Engineer’s Decision, Further Information, and Definitions

December 2021 Nationwide Permits

1. Aids to Navigation

2. Structures in Artificial Canals

3. Maintenance

4. Fish and Wildlife Harvesting, Enhancement, and Attraction Devices and Activities

5. Scientific Measurement Devices

6. Survey Activities

7. Outfall Structures and Associated Intake Structures

8. Oil and Gas Structures on the Outer Continental Shelf

9. Structures in Fleeting and Anchorage Areas

10. Mooring Buoys

11. Temporary Recreational Structures

13. Bank Stabilization

14. Linear Transportation Projects

15. U.S. Coast Guard Approved Bridges

16. Return Water From Upland Contained Disposal Areas

17. Hydropower Projects

18. Minor Discharges

19. Minor Dredging

20. Response Operations for Oil or Hazardous Substances

22. Removal of Vessels

23. Approved Categorical Exclusions

24. Indian Tribe or State Administered Section 404 Programs

25. Structural Discharges

27. Aquatic Habitat Restoration, Establishment, and Enhancement Activities

28. Modifications of Existing Marinas

30. Moist Soil Management for Wildlife

31. Maintenance of Existing Flood Control Facilities

32. Completed Enforcement Actions

33. Temporary Construction, Access, and Dewatering

34. Cranberry Production Activities

35. Maintenance Dredging of Existing Basins

36. Boat Ramps

37. Emergency Watershed Protection and Rehabilitation

38. Cleanup of Hazardous and Toxic Waste

41. Reshaping Existing Drainage Ditches

45. Repair of Uplands Damaged by Discrete Events

46. Discharges in Ditches

49. Coal Remining Activities

53. Removal of Low-Head Dams

54. Living Shorelines

59. Water Reclamation and Reuse Facilities

January 2021 Nationwide Permits

12. Oil or Natural Gas Pipeline Activities

21. Surface Coal Mining Activities

29. Residential Developments

39. Commercial and Institutional Developments

40. Agricultural Activities

42. Recreational Facilities

43. Stormwater Management Facilities

44. Mining Activities

48. Commercial Shellfish Mariculture Activities

50. Underground Coal Mining Activities

51. Land-Based Renewable Energy Generation Facilities

52. Water-Based Renewable Energy Generation Pilot Projects

55. Seaweed Mariculture Activities

56. Finfish Mariculture Activities

57. Electric Utility Line and Telecommunications Activities

58. Utility Line Activities for Water and Other Substances

General Conditions

1. Navigation

2. Aquatic Life Movements

3. Spawning Areas

4. Migratory Bird Breeding Areas

5. Shellfish Beds

6. Suitable Material

7. Water Supply Intakes

8. Adverse Effects from Impoundments

9. Management of Water Flows

10. Fills Within 100-Year Floodplains

11. Equipment

12. Soil Erosion and Sediment Controls

13. Removal of Temporary Fills

14. Proper Maintenance

15. Single and Complete Project

16. Wild and Scenic Rivers

17. Tribal Rights

18. Endangered Species

19. Migratory Birds and Bald and Golden Eagles

20. Historic Properties

21. Discovery of Previously Unknown Remains and Artifacts

22. Designated Critical Resource Waters

23. Mitigation

24. Safety of Impoundment Structures

25. Water Quality

26. Coastal Zone Management

27. Regional and Case-by-Case Conditions

28. Use of Multiple Nationwide Permits

29. Transfer of Nationwide Permit Verifications

30. Compliance Certification

31. Activities Affecting Structures or Works Built by the United States

32. Pre-Construction Notification

District Engineer’s Decision

Further Information

Definitions

Best management practices (BMPs)

Compensatory mitigation

Currently serviceable

Direct effects

Discharge

Ecological reference

Enhancement

Establishment (creation)

High Tide Line

Historic property

Independent utility

Indirect effects

Loss of waters of the United States

Navigable waters

Non-tidal wetland

Open water

Ordinary high water mark

Perennial stream

Practicable

Pre-construction notification

Preservation

Re-establishment

Rehabilitation

Restoration

Riffle and pool complex

Riparian areas

Shellfish seeding

Single and complete linear project

Single and complete non-linear project

Stormwater management

Stormwater management facilities

Stream bed

Stream channelization

Structure

Tidal wetland

Tribal lands

Tribal rights

Vegetated shallows

Waterbody

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas