You can copy from here when filling out the rest of the page.
PUBLIC NOTICE FOR FEDERAL REGISTER NOTICE ANNOUNCING THE REISSUANCE OF THE NATIONWIDE PERMITS
On December 27, 2021, the U.S. Army Corps of Engineers (Corps) published a final rule in the Federal Register (86 FR 73522) announcing the reissuance of 40 existing nationwide permits (NWPs) and one new NWP. These 41 NWPs will go into effect on February 25, 2022, and they will expire on March 14, 2026.
PUBLIC NOTICE FOR FEDERAL REGISTER NOTICE
ANNOUNCING THE REISSUANCE OF THE NATIONWIDE PERMITS
On December 27, 2021, the U.S. Army Corps of Engineers (Corps) published a final rule in the Federal Register (86 FR 73522) announcing the reissuance of 40 existing nationwide permits (NWPs) and one new NWP. These 41 NWPs will go into effect on February 25, 2022, and they will expire on March 14, 2026:
NWP 1 – Aids to Navigation
NWP 2 – Structures in Artificial Canals
NWP 3 – Maintenance
NWP 4 – Fish and Wildlife Harvesting, Enhancement, and Attraction Devices and Activities
NWP 5 – Scientific Measurement Devices
NWP 6 – Survey Activities
NWP 7 – Outfall Structures and Associated Intake Structures
NWP 8 – Oil and Gas Structures on the Outer Continental Shelf
NWP 9 – Structures in Fleeting and Anchorage Areas
NWP 10 – Mooring Buoys
NWP 11 – Temporary Recreational Structures
NWP 13 – Bank Stabilization
NWP 14 – Linear Transportation Projects
NWP 15 – U.S. Coast Guard Approved Bridges
NWP 16 – Return Water From Upland Contained Disposal Areas
NWP 17 – Hydropower Projects
NWP 18 – Minor Discharges
NWP 19 – Minor Dredging
NWP 20 – Response Operations for Oil or Hazardous Substances
NWP 22 – Removal of Vessels
NWP 23 – Approved Categorical Exclusions
NWP 24 – Indian Tribe or State Administered Section 404 Programs
NWP 25 – Structural Discharges
NWP 27 – Aquatic Habitat Restoration, Establishment, and Enhancement Activities
NWP 28 – Modifications of Existing Marinas
NWP 30 – Moist Soil Management for Wildlife
NWP 31 – Maintenance of Existing Flood Control Facilities
NWP 32 – Completed Enforcement Actions
NWP 33 – Temporary Construction, Access, and Dewatering
NWP 34 – Cranberry Production Activities
NWP 35 – Maintenance Dredging of Existing Basins
NWP 36 – Boat Ramps
NWP 37 – Emergency Watershed Protection and Rehabilitation
NWP 38 – Cleanup of Hazardous and Toxic Waste
NWP 41 – Reshaping Existing Drainage Ditches
NWP 45 – Repair of Uplands Damaged by Discrete Events
NWP 46 – Discharges in Ditches
NWP 49 – Coal Remining Activities
NWP 53 – Removal of Low-Head Dams
NWP 54 – Living Shorelines
NWP 59 – Water Reclamation and Reuse Facilities
The new NWP 59 authorizes discharges of dredged or fill material into waters of the United States for the construction, expansion, and maintenance of water reclamation and reuse facilities.
The Corps has also issued final decision documents for these new and reissued
NWPs. These final decision documents are available at www.regulations.gov at docket number COE-2020-0002.
The 40 existing NWPs published in the December 27, 2021, final rule replace the 2017 versions of these NWPs. The 2017 versions of NWPs 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 13, 14, 15, 16, 17, 18, 19, 20, 22, 23, 24, 25, 27, 28, 30, 31, 32, 33, 34, 35, 36, 37, 38, 41, 45, 46, 49, 53, and 54 expire on February 24, 2022.
The NWP general conditions and definitions that were issued in the final rule that was published in the January 13, 2021, issue of the Federal Register (86 FR 2744) apply to the 40 reissued NWPs and the new NWP 59 that were published in the Federal Register on December 27, 2021.
With the publication of this Federal Register notice, Corps divisions will begin finalizing regional conditions for these 41 NWPs. Division Engineers will prepare supplemental documentation to address decisions concerning the addition of regional conditions to the 41 NWPs. Regional conditions will provide additional protection for the aquatic environment, and will help ensure that the NWPs authorize only those activities that have no more than minimal adverse environmental effects. Regional conditions will help ensure protection of high value waters within the Little Rock District.
Corps divisions and districts will also begin determining which conditions for water quality certifications issued by states, tribes, and EPA for the issuance of these 41 NWPs become regional conditions of these NWPs. Water quality certification and regional conditions will be announced in a future public notice issued by the Little Rock District.
The December 27, 2021, Federal Register notice is available for viewing at https://www.federalregister.gov/documents/2021/12/27/2021-27441/reissuance-and-modification-of-nationwide-permits
The January 13, 2021, Federal Register notice is available for viewing at: https://www.federalregister.gov/documents/2021/01/13/2021-00102/reissuance-and-modification-of-nationwide-permits
As an alternative, interested parties can access the December 27, 2021, and January 13, 2021, final rules and related documents at: https://www.usace.army.mil/Missions/Civil-Works/Regulatory-Program-and-Permits/Nationwide-Permits/