The applicant is proposing to construct a storm water detention pond.
Full Public Notice Project Plans
PROJECT DESCRIPTION: The applicant is proposing to construct a storm water detention pond, designated as Detention Pond 9, associated with SH 242. The basin would be approximately 12.28 acres. A 10- to 20-foot-wide earthen maintenance berm would encircle the basin and an inflow structure would convey storm water from the basin eastward through and outfall into Dry Creek. The construction of the proposed Detention Pond 9 would require a total of 6.066 acres of permanent impacts to waters of the U.S., including wetlands (5.963 acres of wetlands and 0.103 acre of non-wetland waters).