The purpose of this notice is to solicit comments from the public; federal, state, and local agencies and officials; tribes; and other interested parties regarding the US Highway 412 westbound bridge rehabilitation over the Verdigris River. Comments received within 10 days of publication of this notice will be used in the evaluation of potential impacts of the proposed action on important resources and in the evaluation of whether the proposed alteration would be injurious to the public interest and/or would impair the usefulness of the authorized project. Only the specific activities that have the potential to occupy, use, or alter lands and waters associated with the McClellan-Kerr Arkansas River Navigation System (MKARNS) at US Highway 412 will be evaluated. Please limit comments to the area of the alteration and those adjacent areas that would be directly or indirectly affected by proposed highway interchange expansion.
LOCATION: Section 32 Section 33 T20N R16E approximately 7.5 miles east of the intersection of US-412 and I-44, east of Fair Oaks, Rogers County, Oklahoma.
REQUESTER: In compliance with U.S.C. Title 33, Chapter 9, Subchapter 1, Section 408, the Oklahoma Department of Transportation (requester) has requested permission from the U.S. Army Corps of Engineers (USACE) for the removal and replacement of the west- bound Highway 412 bridge over the McClellan-Kerr Arkansas River Navigation System –Verdigris River.
REQUESTERS PROPOSED ACTION: The proposed construction will include the removal and replacement of the existing bridge superstructure, abutments, the outside piers (Pier 1 and Pier 4), approach slabs, slope drains and guardrail. New drilled shaft concrete columns will be added to the north side of the center piers (Pier 2 and Pier 3), concrete repairs will be made to the existing center piers, and new pier caps will be added to support the new (41 foot wide) bridge deck. Riprap will be placed around the new abutments. The existing pier protection structures will remain in place. The bridge deck and parapet will be flood coated and sealant will be applied to the tops and sides of the pier caps. The existing facility will remain open to through traffic during the proposed construction, utilizing existing crossovers east and west of the bridge and with phased construction and temporary lane closures. No new rights-of-way will be required to make the proposed improvements. The completed bridge and approaches will essentially mimic the recently-reconstructed parallel (eastbound US-412) facility.