HACKBERRY CARBON SEQUESTRATION PROJECT IN CAMERON PARISH

HACKBERRY CARBON SEQUESTRATION PROJECT IN CAMERON PARISH

NAME OF APPLICANT: Hackberry Carbon Sequestration, LLC, c/o: T. BAKER SMITH, LLC., Attn: Brady Trahan, 107 Global Circle Lafayette, Louisiana 70503.

LOCATION OF WORK: Located in Hackberry, Louisiana, in Cameron Parish, LOCATED IN T12S-R10W, SECTIONS 1-3, 7-11, 14-18 & 19-20, T12S-R11W, SECTIONS 12 & 13, as shown within the attached drawings. (Hydrologic Unit Code 08080206, within the Calcasieu River Basin)

CHARACTER OF WORK: A carbon sequestration project including installation of a CO2 injection well, a 6" suction pipeline (~30,720' in length), a 12" injection pipeline (~15,026' in length), and facility with boathouse and gangplank. Approximately 465,485 cubic yards of native will be excavated for access and pipeline installation, spoil material will be beneficially placed to support marsh creation. Project implementation will impact approximately 290.14 acres of open waters temporarily, approximately 16.94 acres of wetlands temporarily, and approximately 0.17 acres of marsh permanently. If a Department of the Army permit is warranted, the applicant has proposed to mitigate unavoidable permanent wetlands impacts at an approved and acceptable mitigation bank within the N.O. District, if deemed necessary.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas