Home

Nashville District

Run scraper

Public Notice 22-02

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Please address comments to: Nashville District Corps of Engineers Regulatory Division, 3701 Bell Road, Nashville, TN 37214-2660 ATTN: Katie Alston (Katherine.c.alston@usace.army.mil; 615-369-7521

SUBJECT: This notice announces a prospectus has been submitted for the development of the Hayes Fork Wetland Mitigation Bank pursuant to 33 CFR 332, Compensatory Mitigation for Losses of Aquatic Resources (Federal Register: April 10, 2008, effective June 9, 2008).

BANK SPONSOR: Westervelt Ecological Services, LLC. Tennessee District 220 Bridge Street Franklin, Tennessee 37064

LOCATION: The proposed Hayes Fork Wetland Mitigation Bank (HFWMB) comprises approximately 19.6 acres of an approximate 118.8-acre area located 1.5 miles southwest of Bumpus Mills in Stewart County, Tennessee (Figure 1). This site is located within the Western Highland Rim Level IV Ecoregion of the Interior Plateau.

PURPOSE: The HFWMB proposes to provide compensatory wetland mitigation for permitted impacts within the primary geographic service area of the Lower Cumberland (HUC-8:05130205) and the secondary service areas of Harpeth River (HUC-8: 05130204) and Lower Cumberland – Sycamore (HUC-8: 05130202).

GENERAL INFORMATION: Mitigation banks are defined as a site, or suite of sites, where aquatic resources (e.g., wetlands, streams, riparian areas) are restored, established, enhanced, and/or preserved for the purpose of providing compensatory mitigation for impacts authorized by Department of the Army (DA) permits pursuant to Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act. In general, units of restored, established, enhanced or preserved wetlands or streams are expressed as “credits” which may subsequently be withdrawn to offset “debits” incurred at a permitted project site. In this way, a permit requirement to provide compensatory mitigation can be transferred to the mitigation bank sponsor. The operation and use of a mitigation bank are governed by an approved mitigation banking instrument (MBI). The MBI is the legal document for the establishment, operation and use of a mitigation bank. This bank is intended to be a private commercial bank. The sponsor would be responsible for the successful development of the mitigation bank including monitoring and reporting requirements.

A group of federal and state regulatory and resource agency representatives known as the Interagency Review Team (IRT) would oversee the execution and management of the project. The IRT is chaired by the US Army Corps of Engineers, Nashville District (Corps). The primary role of the IRT is to facilitate establishment of the mitigation site through the development of a MBI. The IRT will review the prospectus, instrument, and other appropriate documents and provide comments to the Corps.

Approval of the use of the bank for specific projects is the decision of the USACE pursuant to Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act and/or the Tennessee Department of Environment and Conservation (TDEC) pursuant to Section 401 of the CWA and/or applicable State of Tennessee statute(s) and regulation(s).

PROJECT DESCRIPTION: HFWMB proposes to re-establish and enhance 19.6 acres of floodplain wetlands by removing a pond dam impeding flow of a natural spring, reconnecting the wetland area with Hayes Fork, and replanting the site with native wetland vegetation (see table 1 below for proposed credit generation and mitigation approaches). As depicted in Exhibit 3, HFWMB would share the proposed site with two (2) restoration stream projects.

Table 1. Proposed Mitigation Approaches for HFWMB

The project prospectus can be viewed at: http://www.lrn.usace.army.mil/Media/PublicNotices.aspx. Information in the mitigation plan would serve as the basis for deriving and releasing credits for the mitigation bank.

HISTORIC AND CULTURAL RESOURCES: At this early stage in the regulatory process, no project design plans have been submitted; therefore, the Corps cannot complete an effects determination for historic and cultural resources. The Corps invites responses to this public notice from American Indian Tribes or tribal governments; Federal, State, and local agencies; historical and archeological societies; and other parties likely to have knowledge of or concerns regarding historic properties and cultural significance at or near the project area. Upon submittal of the design plans, USACE will evaluate the design plans along with any substantive comments from this public notice to determine the potential of impacts to historic and cultural resources for Section 106 compliance. If the Corps determines that consultation is required, the Corps will consult with the Tennessee Historic Commission (SHPO) and American Indian Tribes in accordance with Section 106 of the National Historic Preservation Act, as appropriate.

ENDANGERED/THREATENED SPECIES REVIEW: A review of the United States Fish and Wildlife Service (USFWS) website, http://ecos.fws.gov/ipac identified the following federally-listed species that are known to or believed to occur in the vicinity of the proposed project (Table 2):

Table 2. Potential Endangered and Threatened Species in the Proposed Project

Group

Common Name/ Scientific Name

Federal Status

Mammal

Gray bat /Myotis grisescens

Endangered

Mammal

Indiana bat / Myotis sodalis

Endangered

Mammal

Northern Long-eared Bat / Myotis septentrionalis

Threatened

Clam

Rabbitsfoot/ Quadrula cylindrica cylindrica

Threatened

Insect

Monarch Butterfly / Danaus plexippus

Candidate

Plant

Prices Potato-bean / Apios priceana

Threatened

A copy of this notice is being furnished to USFWS for their review. After receipt of any comments, the USACE will evaluate the potential effects to proposed and/or listed species and their designated critical habitat, and initiate consultation with the U.S. Fish & Wildlife Service, if required.

OTHER APPROVALS: Water Quality Certification from Tennessee Department of Environment and Conservation (TDEC) pursuant to Section 401 (a)(1) of the CWA is required for the proposed project. Other federal, state, and/or local approvals may be required for the proposed work.

SOLICITATION OF COMMENTS: The Corps is soliciting comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historical properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

EVALUATION:After the end of the comment period, the district engineer will review all comments received and make an initial determination as to the potential of the proposed project to provide compensatory mitigation for activities authorized by DA permits. That determination will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. Factors relevant to the proposal will be considered including conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people.

REQUEST FOR PUBLIC HEARING:Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

COMMENT PERIOD: Written statements received in this office by February 24, 2022 (30 days) will become a part of the record and will be considered in the determination. Any response to this notice should be directed to the Nashville District Corps of Engineers, Regulatory Division, Attention: Ms. Katie Alston at the above address or by email: katherine.c.alston@usace.army.mil.

\s\

Joshua W. Frost

Chief, Technical Services Branch

Regulatory Division

U.S. Army Corps of Engineers

Nashville District

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas