*** STATE - OHIO *** *** APPLICANT - BUCKEYE XO, LLC *** *** PURPOSE - The applicant has requested a DA authorization to discharge dredged and/or fill material into (2) wetlands, four (4) streams , and one (1) open-water impoundment , in conjunction with the Buckeye Yard Development Project
TO WHOM IT MAY CONCERN: The following application has been submitted for a Department of the Army (DA) Permit under the provisions of Section 404 of the Clean Water Act.
APPLICANT: Ms. Gretchen Kendrick
Buckeye XO, LLC
2100 Ross Avenue, Suite 895
Dallas, Texas 75201
LOCATION: As depicted on the attached Sheet 1 of 3, the proposed project would be located north of Trabue Road and south of Roberts Road in the City of Columbus, Franklin County, Ohio (39.991777 latitude, -83.130647 longitude). The waters on site flow into an unnamed tributary to the Scioto River, a traditional navigable water of the United States.
DESCRIPTION OF PROPOSED WORK: The applicant has requested a DA authorization to discharge dredged and/or fill material into 0.78 acre of two (2) wetlands (Wetlands 7-8), 7,162 linear feet (1.97 acres) of four (4) streams (Streams 9-12), and 0.23 acre of one (1) open-water impoundment (Pond 1), as indicated on Table 1 of this Public Notice, in conjunction with the Buckeye Yard Development Project. Specifically, the project would involve the construction of eight (8) industrial logistics warehouse buildings and associated infrastructure such as a roadway, parking areas, trailer docks, and storm-water detention basins (Sheets 2-3 of 3).
ALTERNATIVES ANALYSIS: As a result of the proposal, dredged and/or fill material would be discharged into 0.49 acre of forested wetland, 0.29 acre of emergent wetland, 320 linear feet of intermittent stream, 6,842 linear feet of perennial stream, and 0.23 acre of open-water impoundment. The project does not require access, proximity to, or siting within special aquatic sites to fulfill its basic purpose and is considered a non-water dependent activity. The Section 404(b)(1) Guidelines state for non-water dependent activities, practicable alternatives that do not involve special aquatic sites are presumed to be available, unless clearly demonstrated otherwise. The applicant has submitted an alternatives analysis and it is currently under review. A complete copy of the applicant’s alternatives analysis can be reviewed by appointment at the above address or by submitting a request in accordance with the Freedom of Information Act. No permit will be issued until our review of the alternative analysis clearly demonstrates that practicable upland alternatives are not available to achieve the overall project purpose.
AVOIDANCE AND MINIMIZATION: In evaluating a project area containing waters of the United States, consideration must be given to avoiding impacts on these sites. If waters of the United States cannot be avoided, then the impacts must be minimized. Approximately 0.78 acre of two (2) wetlands, 7,162 linear feet of four (4) streams, and 0.23 acre of one (1) open-water impoundment are located within the site. Based on a review of the submitted report, the existing streams were previously re-routed and channelized around the existing railyard area and exhibit a high degree of bank erosion, limited substrate, and moderate to high turbidity. The proposed design would result in permanent impacts to the aforementioned aquatic resources located within the project area; however, stream habitat would be relocated and restored on-site. Stormwater management planning would incorporate best management practices (BMPs) and water pollution controls necessary to maintain compliance with the Federal Water Pollution Control Act and Ohio Water Pollution Control Act. Stormwater management and erosion control systems would be implemented during construction, including silt fences, mulch and/or earthen berms, temporary seeding, hay bales, inlet protection, temporary collection basins, diversion ditches, and construction entrances. All disturbed areas would be seeded and/or revegetated with native plant species and native seed mixes after completion of construction activities.
COMPENSATORY MITIGATION PLAN: To compensate for the loss of waters of the United States associated with the proposed project, the applicant has proposed to purchase 1.3 acre of forested wetland credits and 0.6 acre of non-forested wetland credits from the Little Scioto Wetland Mitigation Bank and restore 7,359 linear feet of open stream channel on-site. A stream relocation/restoration plan is currently being prepared by Kimley-Horn on behalf of the applicant. After review of all the submitted information, the Corps will determine if the type and level of compensatory mitigation are adequate in the event a decision is made to issue a DA authorization.
WATER QUALITY CERTIFICATION: The applicant must obtain a Section 401 Water Quality Certification (WQC) from the Ohio Environmental Protection Agency assuring that applicable laws and regulations pertaining to water quality are not violated. This Public Notice serves as the notification to the Administrator of the United States Environmental Protection Agency (USEPA) pursuant to Section 401(a)(2) of the Clean Water Act. If USEPA determines that the proposed discharge may affect the quality of the waters of any state other than the state in which the discharge will originate, it will so notify such other state, the district engineer, and the applicant. If such notice or a request for supplemental information is not received within 30 days of issuance of this Public Notice, the district engineer will assume the USEPA has made a negative determination with respect to Section 401(a)(2). If the USEPA determines another state's waters may be affected, such state has 60 days from receipt of the USEPA's notice to determine if the proposed discharge will affect the quality of its waters so as to violate any water quality requirement in such state, to notify the USEPA and the district engineer in writing of its objection to permit issuance, and to request a public hearing. If such occurs, the district engineer will hold a public hearing in the objecting state. A DA permit, if otherwise warranted, would not be issued on this project until the Section 401 WQC has been issued or waived and the Section 401(a)(2) process has been completed. The Reasonable Period of Time for the certifying authority (Ohio Environmental Protection Agency) to act on the Section 401 WQC will be 270 days from the date the Ohio Environmental Protection Agency receives a complete application in accordance with their requirements. A waiver may be explicit or will be deemed to occur if the Ohio Environmental Protection Agency fails or refuses to act on a request for certification within 270 days after receipt of a complete Section 401 WQC application.
HISTORIC AND CULTURAL RESOURCES: The National Register of Historic Places (NRHP) has been consulted and it has been determined there are no properties currently listed on the NRHP that would be indirectly or directly affected by the proposed work. One (1) previously identified archaeological site (33FR1319) is located within the project area; however, this resource was determined to be ineligible for inclusion onto the NRHP. In addition, the site has been extensively disturbed by previous development and contains poorly drained and urban complex soils, which indicate a low potential for significant intact archaeological sites. By letter dated September 27, 2021, the Ohio State Historic Preservation Office (Ohio SHPO) stated that no historic properties would be affected by the undertaking (2021-FRA-52518).
Based on this information, the Corps has determined that no historic properties listed on, or eligible for listing on the NRHP would be affected by the proposed development and mitigation activities. A copy of this Public Notice will be furnished to Ohio SHPO for their review and response.
THREATENED AND ENDANGERED SPECIES: The proposed project is located within the known or historic range of the endangered Indiana bat (Myotis sodalis), the threatened northern long-eared bat (Myotis septentrionalis), and the endangered Scioto madtom (Noturus trautmani).
Suitable habitat for the Scioto madtom may be present anywhere preferred habitat is found in Franklin County, Ohio. Habitat includes well-developed riffle/run/pool complexes with firm-bottomed sand, cobble, and/or gravel substrates. The proposed project area does not include suitable habitat for the Scioto madtom, and the utilization of BMPs would limit sedimentation downstream. Therefore, the Corps has determined the proposed project would have no effect on the Scioto madtom.
Suitable habitat for the Indiana bat and the northern long-eared bat may be present anywhere preferred habitat is found in Ohio. The Corps is not aware of any caves or abandoned mines in the proposed project area. The Corps is also not aware of any abandoned railroad tunnels in the project area that could provide winter habitat for the Indiana bat or the northern long-eared bat. Based on a review of the technical assistance letter (03E15000-2021-TA-2114) provided by the United States Fish and Wildlife Service (USFWS) on September 3, 2021, the large amount of proposed tree clearing relative to the available habitat in the immediately surrounding area may result in indirect adverse effects to the Indiana bat. The USFWS recommended a summer survey be conducted to determine the presence or absence of Indiana bats within the project area.
The summer survey is anticipated to be conducted in June 2022 as soon as the survey season begins. The Corps will initiate coordination with the USFWS upon receipt of the completed summer survey report. The DA permit will not be issued until the requirements of Section 7(c) of the Endangered Species Act of 1972 (as amended) are fulfilled.
PUBLIC INTEREST REVIEW AND CUMULATIVE EFFECTS: This application will be reviewed in accordance with 33 CFR 320‑332, the Regulatory Program of the Corps, and other pertinent laws, regulations, and executive orders. Our evaluation will also follow the guidelines published by the USEPA pursuant to Section 404(b)(1) of the Clean Water Act (40 CFR Part 230). The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the proposed activity on the public interest. That decision will reflect the national concern for both the protection and the utilization of important resources. The benefit that reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors that may be relevant to the proposal will be considered, including the cumulative effects thereof; among those factors are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people.
SOLICITATION OF COMMENTS: The Corps is soliciting comments from the public, federal, state and local agencies and officials, Indian Tribes and other interested parties in order to consider and evaluate the impacts of this proposed activity. For accuracy and completeness of the administrative record, all data in support of or in opposition to the proposed work should be submitted in writing (preferably via email if possible) setting forth sufficient detail to furnish a clear understanding of the reasons for support or opposition. Any person may request, in writing, within the comment period specified in the notice, that a public hearing be held to consider the application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Written statements, either physical or electronic, received in this office on or before the expiration date of this Public Notice will become a part of the record and will be considered in the final determination. A permit will be granted unless its issuance is found to be contrary to the public interest.
CLOSE OF COMMENT PERIOD: Comments and requests for additional information should be submitted electronically to Katie Samples by email at Katie.E.Samples@usace.army.mil.
If you do not have internet access, comments may be submitted through the U.S. Postal Service
(USPS) to the following address:
United States Army Corps of Engineers
ATTN: CELRH-RD-N
Public Notice: LRH-2021-551-SCR
502 Eighth Street
Huntington, WV 25701-2070
Comments should only be provided through the USPS when electronic transmission is not possible. Precautionary internal mail handling procedures may be instituted to protect our workforce, which may result in longer than normal times to process and receive hard copy submissions. To be considered in our evaluation, comments submitted through the USPS should have a postmark dated on, or prior to, the close of the comment period listed on page one (1) of this Public Notice.
Table 1. Proposed Discharges of Dredged and/or Fill material into Waters of the United States associated with the Buckeye Yard Redevelopment Project.
Aquatic Resource ID
Latitude & Longitude
(°N) (°W)
Flow Regime or Cowardin Class
Estimated Amount of Aquatic Resource in Review Area
Linear Feet and/or Acres of Fill in Impact Area
Wetland 7
39.998444
-83.130556
Palustrine Forested
0.49 acre
0.49 acre
Wetland 8
39.997300
-83.131078
Palustrine Emergent
0.29 acre
0.29 acre
Stream 9
40.002489
-83.128431
Intermittent
320 linear feet
320 linear feet
(0.03 acre)
Stream 10
39.997258
-83.132658
Perennial
2,552 linear feet
2,552 linear feet (0.52 acre)
Stream 11
39.993333
-83.134142
Perennial
3,921 linear feet
3,921 linear feet (1.29 acres)
Stream 12
39.989911
-83.134697
Perennial
369 linear feet
369 linear feet
(0.13 acre)
Pond 1
39.997153
-83.131842
Palustrine, Unconsolidated Bottom
0.23 acre
0.23 acre