Contractors are working on the RJ Corman Railroad Bridge on the LDB at Cumberland River Mile 126.5.

Contractors are working on the RJ Corman Railroad Bridge on the LDB at Cumberland River Mile 126.5. The work area includes a turbidity curtain in the water which is intended to be pulled against the bank, notextendinto the navigation channel. It will be adjusted closer to the bank, as the project progresses based on weather and water conditions, with the goal of having itas close to the riprap as possible. The driving of sheet pile is scheduled to conclude by February 10th, 2022 based on rain and river conditions. After this, the riprap will be removed and replaced with a concrete pad by March 1st, 2022. At this time, it is anticipatedthis will conclude the shoreline operations of the bridge pier repair.

POC for this notice is: Kevin Walker; CSR; 615-247-5384

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas