Permanent Lower Dock Barge Construction LaFarge-Holcim Facility: Cumberland River Mile 7.2 RDB

Sterling Industrial isconducting the final installation of the permanent lower dock barge at the Lafarge-Holcim facility at Cumberland River Mile 7.2 RDB. Installation beganFebruary 1, 2022 and is estimated to be complete onMarch 18, 2022. During this time, expect to seeseveral barges in the water (a 110’ x 51’ crane barge and a 100’ x 30’ material barge). After working hours, the barges will be moored at the down-river end of the new lower dock barge. Crews will monitor Marine Channels 13 and 78.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas