Home

St. Louis District

Run scraper

STATE OF MISSOURI -- Nationwide Permit Reissuance and Regional Conditions - Issuance of Regional Conditions. On December 27

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

STATE OF MISSOURI -- Nationwide Permit Reissuance and Regional Conditions - Issuance of Regional Conditions. On December 27, 2021, the U.S. Army Corps of Engineers published a final rule in the Federal Register (86 FR 73522) announcing the reissuance of 40 existing nationwide permits (NWPs) and one new NWP, as well as the reissuance of NWP general conditions and definitions with some modifications. These 41 NWPs will go into effect on February 25, 2022, and will expire on March 14, 2026.

STATE OF MISSOURI -- Nationwide Permit Reissuance and Regional Conditions - Issuance of Regional Conditions. On December 27, 2021, the U.S. Army Corps of Engineers published a final rule in the Federal Register (86 FR 73522) announcing the reissuance of 40 existing nationwide permits (NWPs) and one new NWP, as well as the reissuance of NWP general conditions and definitions with some modifications. These 41 NWPs will go into effect on February 25, 2022, and will expire on March 14, 2026.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas