You can copy from here when filling out the rest of the page.
SPECIAL PUBLIC NOTICE NATIONWIDE PERMIT REGIONAL CONDITIONS FOR LOUISIANA
SPECIAL PUBLIC NOTICE NATIONWIDE PERMIT REGIONAL CONDITIONS FOR LOUISIANA
On December 27, 2021, the U.S. Army Corps of Engineers (Corps) published notice in the Federal Register (86 FR 73522) announcing the reissuance of 40 existing Nationwide Permits (NWPs) and issuance of one new NWP. The NWP general conditions and definitions published in the January 13, 2021 issue of the Federal Register (86 FR 2744) for the 16 NWPs also apply to these 41 NWPs. The following 41 NWPs will go into effect on February 25, 2022, and will expire on March 14, 2026:
NWP 1 – Aids to Navigation
NWP 2 – Structures in Artificial Canals
NWP 3 – Maintenance
NWP 4 – Fish and Wildlife Harvesting, Enhancement, and Attraction Devices and Activities
NWP 5 – Scientific Measurement Devices
NWP 6 – Survey Activities
NWP 7 – Outfall Structures and Associated Intake Structures
NWP 8 – Oil and Gas Structures on the Outer Continental Shelf
NWP 9 – Structures in Fleeting and Anchorage Areas
NWP 10 – Mooring Buoys
NWP 11 – Temporary Recreational Structures
NWP 13 – Bank Stabilization
NWP 14 – Linear Transportation Projects
NWP 15 – U.S. Coast Guard Approved Bridges
NWP 16 – Return Water From Upland Contained Disposal Areas
NWP 17 – Hydropower Projects
NWP 18 – Minor Discharges
NWP 19 – Minor Dredging
NWP 20 – Response Operations for Oil or Hazardous Substances
NWP 22 – Removal of Vessels
NWP 23 – Approved Categorical Exclusions
NWP 24 – Indian Tribe or State Administered Section 404 Programs
NWP 25 – Structural Discharges
NWP 27 – Aquatic Habitat Restoration, Establishment, and Enhancement Activities
NWP 28 – Modifications of Existing Marinas
NWP 30 – Moist Soil Management for Wildlife
NWP 31 – Maintenance of Existing Flood Control Facilities
NWP 32 – Completed Enforcement Actions
NWP 33 – Temporary Construction, Access, and Dewatering
NWP 34 – Cranberry Production Activities
NWP 35 – Maintenance Dredging of Existing Basins
NWP 36 – Boat Ramps
NWP 37 – Emergency Watershed Protection and Rehabilitation
NWP 38 – Cleanup of Hazardous and Toxic Waste
NWP 41 – Reshaping Existing Drainage Ditches
NWP 45 – Repair of Uplands Damaged by Discrete Events
NWP 46 – Discharges in Ditches
NWP 49 – Coal Remining Activities
NWP 53 – Removal of Low-Head DamsNWP 54 – Living Shorelines
NWP 59 – Water Reclamation and Reuse Facilities
On February 3, 2022, the Mississippi Valley Division Engineer approved regional
conditions for the state of Louisiana that apply to all activities authorized by these 41
NWPs. Regional conditions provide additional protections for the aquatic environment
by ensuring that the NWPs authorize only those activities with minimal adverse effects
on the aquatic environment. The New Orleans District has posted the regional
conditions for NWPs issued in Louisiana on our Regulatory webpage at:
https://www.mvn.usace.army.mil/Missions/Regulatory/Permits/Nationwide-Permits-Program/
For more details, go to the special public notice document.