The application is for the discharge of dredged or fill material into Lake Hefner for shoreline repair and bank stabilization of approximately 1

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The application is for the discharge of dredged or fill material into Lake Hefner for shoreline repair and bank stabilization of approximately 1,400 linear feet (lf) of eroded bank on the east side of Lake Hefner.

Location: The proposed project is located on the east side of Lake Hefner immediately west of Lake Front Hefner Park in Section 25, Township 13 North, Range 4 West, Oklahoma County, Oklahoma. The project site can be found on the USGS, 1:24,000-scale, Britton, Oklahoma 7.5-minute Quadrangle at North Latitude 35.573922 and West Longitude 97.579748.

Project Description: The application is for the discharge of dredged or fill material into Lake Hefner for shoreline repair and bank stabilization of approximately 1,400 linear feet (lf) of eroded bank on the east side of Lake Hefner.

Purpose: The basic purpose of this work is bank stabilization and shoreline restoration. There are no special aquatic sites on the project. A water dependency determination is not necessary since no special aquatic sites are located within the project site.

The overall project purpose would repair the existing eroded shoreline that was damaged during recent high-water events and stabilize approximately 1,400 lf of bank on the east side of Lake Hefner. The repair and stabilization of the bank proposed by the applicant would help conserve the water quality within Lake Hefner by preventing further erosion.

Description of Work: Approximately 5,000 CY of red-shale earthen fill material would be placed along approximately 1,400 lf of Lake Hefner’s bank and then be compacted to match the existing grade prior to the erosion of the bank, restoring approximately 0.7 acre of shoreline. Following the placement of the earthen fill material, approximately 1,000 CY of 12-inch riprap would be placed on top of the earthen fill material along the 1,400 lf of Lake Hefner’s bank, as depicted on the enclosed plans (Enclosures 1-5). The remaining disturbed areas would be revegetated via a hydroseeding application.

The proposed work would be accomplished by placing all fill material via a front-end loader and/or a tracked excavator, neither of which would operate below the OHWM. All material and equipment would be staged off-site at the existing material yard south of the lake or at the Hefner Water Treatment Plant.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas