On December 27, 2021, the U.S. Army Corps of Engineers (Corps) published a final rule in the Federal Register (86 FR 73522) announcing the reissuance of 40 existing nationwide permits (NWPs) and one new NWP as well as the reissuance of NWP general conditions and definitions with some modifications. These 41 NWPs will go into effect on February 25, 2022, and they will expire on March 14, 2026:
On December 27, 2021, the U.S. Army Corps of Engineers (Corps) published a final rule in the Federal Register (86 FR 73522) announcing the reissuance of 40 existing nationwide permits (NWPs) and one new NWP as well as the reissuance of NWP general conditions and definitions with some modifications. These 41 NWPs will go into effect on February 25, 2022, and they will expire on March 14, 2026:
NWP 1 – Aids to Navigation
NWP 2 – Structures in Artificial Canals
NWP 3 – Maintenance
NWP 4 – Fish and Wildlife Harvesting, Enhancement, and Attraction Devices and Activities
NWP 5 – Scientific Measurement Devices
NWP 6 – Survey Activities
NWP 7 – Outfall Structures and Associated Intake Structures
NWP 8 – Oil and Gas Structures on the Outer Continental Shelf
NWP 9 – Structures in Fleeting and Anchorage Areas
NWP 10 – Mooring Buoys
NWP 11 – Temporary Recreational Structures
NWP 13 – Bank Stabilization
NWP 14 – Linear Transportation Projects
NWP 15 – U.S. Coast Guard Approved Bridges
NWP 16 – Return Water From Upland Contained Disposal Areas
NWP 17 – Hydropower Projects
NWP 18 – Minor Discharges
NWP 19 – Minor Dredging
NWP 20 – Response Operations for Oil or Hazardous Substances
NWP 22 – Removal of Vessels
NWP 23 – Approved Categorical Exclusions
NWP 24 – Indian Tribe or State Administered Section 404 Programs
NWP 25 – Structural Discharges
NWP 27 – Aquatic Habitat Restoration, Establishment, and Enhancement Activities
NWP 28 – Modifications of Existing Marinas
NWP 30 – Moist Soil Management for Wildlife
NWP 31 – Maintenance of Existing Flood Control Facilities
NWP 32 – Completed Enforcement Actions
NWP 33 – Temporary Construction, Access, and Dewatering
NWP 34 – Cranberry Production Activities
NWP 35 – Maintenance Dredging of Existing Basins
NWP 36 – Boat Ramps
NWP 37 – Emergency Watershed Protection and Rehabilitation
NWP 38 – Cleanup of Hazardous and Toxic Waste
NWP 41 – Reshaping Existing Drainage Ditches
NWP 45 – Repair of Uplands Damaged by Discrete Events
NWP 46 – Discharges in Ditches
NWP 49 – Coal Remining Activities
NWP 53 – Removal of Low-Head Dams
NWP 54 – Living Shorelines
NWP 59 – Water Reclamation and Reuse Facilities
The new NWP 59 authorizes discharges of dredged or fill material into waters of the United States for the construction, expansion, and maintenance of water reclamation and reuse facilities.
The December 27, 2021, Federal Register notice is available for viewing at https://www.federalregister.gov/documents/2021/12/27/2021-27441/reissuance-and-modification-ofnationwide-permits. As an alternative, interested parties can access the December 27, 2021, and January 13, 2021, final rules and related documents at: https://www.usace.army.mil/Missions/Civil- Works/Regulatory-Program-and-Permits/Nationwide-Permits/
It should be noted that on January 13, 2021, the U.S. Army Corps of Engineers (Corps) published a final rule in the Federal Register (86 FR 2744) announcing the reissuance of 12 existing nationwide permits (NWPs) and four new NWPs, as well as the reissuance of NWP general conditions and definitions with some modifications. These 16 NWPs went into effect on March 15, 2021and will expire on March 14, 2026:
NWP 12 – Oil or Natural Gas Pipeline Activities
NWP 21 – Surface Coal Mining Activities
NWP 29 – Residential Developments
NWP 39 – Commercial and Institutional Developments
NWP 40 – Agricultural Activities
NWP 42 – Recreational Facilities
NWP 43 – Stormwater Management Facilities
NWP 44 – Mining Activities
NWP 48 – Commercial Shellfish Mariculture Activities
NWP 50 – Underground Coal Mining Activities
NWP 51 – Land-Based Renewable Energy Generation Facilities
NWP 52 – Water-Based Renewable Energy Generation Pilot Projects
NWP 55 – Seaweed Mariculture Activities
NWP 56 – Finfish Mariculture Activities
NWP 57 – Electric Utility Line and Telecommunications Activities
NWP 58 – Utility Line Activities for Water and Other Substances
The January 13, 2021, Federal Register notice is available for viewing at https://www.federalregister.gov/documents/2021/01/13/2021-00102/reissuance-and-modification-ofnationwide-
permits.
The regional conditions for these 16 NWPs remain in effect and can be found at https://www.spa.usace.army.mil/Missions/Regulatory-Program-and-Permits/NWP/.
In accordance with the U.S. Environmental Protection Agency’s (EPA’s) current water quality certification (WQC) regulations at 40 Code of Federal Regulations (CFR) Part 121, the Albuquerque District has reviewed Clean Water Act Section (CWA) 401 WQC decisions received from certifying authorities. The Albuquerque District has determined that all accepted granted and denied WQC decisions in Navajo Nation satisfied the requirements set forth in 40 CFR 121.7. For a list of WQC decisions in Navajo Nation see the summary spreadsheet attached to this public notice.
If a permittee conducts activities under the terms and conditions of a NWP, the permittee must also comply with any applicable regional conditions. In Navajo Nation, the following regional conditions apply to the 41 NWPs listed above:
Pre-Construction Notification (PCN) for Dredge and Fill Activities in Lakes, Intermittent and Perennial Streams, and Special Aquatic Sites.
Notification to the District Engineer in accordance with general condition (GC) 32 is required for all proposed activities in lakes, intermittent and perennial streams, and special aquatic sites (including wetlands, riffle and pool complexes, and sanctuaries and refuges).
The permittee shall notify the U.S. Army Corps of Engineers (Corps) in accordance with GC 32 using either the South Pacific Division PCN or application form (ENG Form 4345) with an
attachment providing information on compliance with all general and regional conditions. In addition, the application shall include:
A written statement describing how the activity has been designed to avoid and minimize adverse effects, both temporary and permanent, to waters of the United States (U.S.); and
Drawings, including plan and cross-section views, clearly depicting the location, size, and dimensions of the proposed activity, as well as the location of delineated waters of the U.S. on the site. The drawings shall contain a title block, legend and scale, amount (in cubic yards) and area (in acres) of fill in Corps jurisdiction, including both permanent and temporary
fills/structures. The ordinary high-water mark or, if tidal waters, the mean high-water mark and high tide line, should be shown (in feet), based on National Geodetic Vertical Datum (NGVD) or other appropriate referenced elevation. Unless specifically waived by a specific Corps District, all drawings shall follow the South Pacific Division February 2016, Updated Map and Drawing Standards for the South Pacific Division Regulatory Program, or most recent update (available on the South Pacific Division website: http://www.spd.usace.army.mil/Missions/Regulatory/PublicNoticesandReferences.aspx/)
2. Timing and Dewatering
Unless determined to be not practicable by the Corps, no dredged and/or fill material shall be discharged within standing or flowing waters. For perennial or intermittent drainages (e.g., natural or
relocated streams, creeks, rivers), this may be accomplished through construction during periods of low flow (winter months) or during the dry season.
When work is required to occur in flowing water, a dewatering plan is required to constitute a complete PCN. All dewatering structures and/or fills shall be removed within 30 days following
completion of construction activities in WOTUS.
For all dewatering activities that propose structures or fill in WOTUS, a dewatering plan must contain the following:
Information on why it is not practicable to conduct construction activities during periods of low flow or during the dry season;
The proposed methods for dewatering;
The equipment that would be used to conduct the dewatering;
The length of time the area is proposed to be dewatered;
The area (in acres) and length (in linear feet) and locations of all structure(s) and/or fill in waters of the U.S.;
The expected extent of temporary impacts to downstream waters;
The method for removal of the structures and/or fill;
The method for how the proposed work shall be conducted to allow safe fish and wildlife passage during construction; and
The method for restoration of the waters of the U.S. affected by the structure or fill following construction.
3. Suitable Fill
Use of broken concrete as fill or bank stabilization material is prohibited unless the applicant demonstrates that its use is the only practicable material (with respect to cost, existing technology, and logistics). Any applicant who wishes to use broken concrete as bank stabilization must provide a PCN to the District Engineer in accordance with GC 32 along with justification for such use. Use of broken concrete with rebar, used tires (loose or formed into bales), or car bodies is prohibited in all WOTUS.
4. Compliance
The permittee shall allow Corps representatives to inspect the authorized activity and any avoidance, preservation and/or compensatory mitigation areas at any time deemed necessary to determine compliance with the terms and conditions of the NWP verification. The permittee will be notified by the Corps in advance of an inspection.