The application is for the placement of dredged or fill material to construct a new road with bridge abutments, riprap, and concrete piers for a new bridge. Since the original authorization of this project, no changes have been made to the design and no relevant changes in the site conditions have occurred. Hence, the comment period on this public notice is reduced to 15-day.

Location: The proposed project is in the South 1/2 of Section 13, Township 14 North, Range 8 East, Creek County, Oklahoma. The project site can be found on the Gypsy, Oklahoma 7.5 Minute USGS Quadrangle map at North Latitude 35.683835 and West Longitude -96.414763.

History: Creek County requested an extension for the authorized project on SWT-2016-125 (Oklahoma Department of Transportation Job Piece 28681(04)) on February 7, 2022. The project expired on November 30, 2021. Creek County notified the Corps that the project was delayed because of state budgetary constraints and the project lets in March 2022 and construction is expected to begin by July 2022. The Corps required the purchase of 21.6 wetland credits for this proposal via the approved mitigation plan. On April 16, 2019, Creek County verified that they purchased the required 21.6 wetland credits.

Purpose: The overall purpose of this work is to replace a structurally deficient bridge to maintain safe and reliable traffic along this segment of county road on NS 370 (South 369th West Avenue). The project is not a water dependent activity.

Description of Work: The applicant proposes the placement of dredge for fill material into jurisdictional waters and adjacent wetlands using 58,847 cubic yards (CY) of earthen materials, 1,340 CY for 6-inch aggregate Type A, and 3,388 CY of 18-inch riprap for bank stabilization for abutments and the road base. The total project length is approximately 2,365 linear feet. The new road would impact two wetland areas that total 2.90 acres and two stream channels with reinforced concrete pipes for 0.18 acre (259 linear feet). The applicant also proposes to construct a new P.C. Beam Span bridge that consist of two -115 feet sections and four - 100 feet sections with five 48- inch diameter piers using for concrete and steel that total 0.005 acre.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas